NYC DOB record · X01399121-I1

950 River Avenue

950 River Avenue, Bronx, NY 10452

Alteration filing in Concourse-Concourse Village, Bronx. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 22, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · X01399121-I1

950 River Avenue

Bronx, NY 10452

Alteration filing · status dated Sep 17, 2026

Current record
Approved
Proposed scale
1 stories
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing X01399121-I1 as a alteration filing at 950 River Avenue, Bronx, NY 10452. Its latest published status category is Approved, dated Sep 17, 2026. The filing records 1 proposed story.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Sep 17, 2026
Proposed scale
1 proposed story
Applicant of recordSee the 77 filings that name Edg
FiledAug 11, 2026
Current recordApproved
Proposed scale1 stories
Recorded cost$900,000

What the filing says

A public-record reading of the proposed work.

Garage repairs on the first floor and roof as shown on the drawings filed herewith. No change in use, egress, or occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 3-story garage or fuel station built in 1975, on a 130,600 sq ft lot.

Built
1975
Last altered
2009
Floors
3
Residential units
0
Building type
Garage or fuel station
Land use
Parking facilities
Zoning district
R8
Lot area
130,600 sq ft
Building area
258,200 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 22, 2026. They describe the tax lot, not this filing.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing X01399121-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,798 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
X01399121-I1
BIN
2002992
BBL
2024850001
Review type
Standard Plan Examination
Existing stories
1
Proposed stories
1
Existing dwelling units
0
Proposed dwelling units
0
General constructionStructural work