What the filing says
A public-record reading of the proposed work.
Filing for interior renovation of existing eating and drinking establishment. no change to use or bulk.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 3-story mainly residential with some commercial built in 1931, with 4 homes, on a 5,905 sq ft lot.
- Built
- 1931
- Floors
- 3
- Residential units
- 4
- Building type
- Mainly residential with some commercial
- Land use
- Mixed residential and commercial
- Zoning district
- R6B
- Lot area
- 5,905 sq ft
- Building area
- 8,530 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 4, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 1 open notice on record for this building, out of 20 notices on file; the most recent was issued Sep 10, 2026.
- Construction
Issued Sep 10, 2026 — BORO COMISSIONER HAS ORDERED WORK STOPPED FOR JOB # Q01421451-I1 WR000015015 & Q01421451-I1 WR000015016 DUE TO APPLICANT WITHDRAWAL
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 21, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing Q01421451-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 74,561 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- Q01421451-I1
- BIN
- 4457278
- BBL
- 4091690010
- Postal code
- 11417 · 54 filings
- Review type
- Professional Certification
- Existing stories
- 3
- Proposed stories
- 3
- Existing dwelling units
- 4
- Proposed dwelling units
- 4