What the filing says
A public-record reading of the proposed work.
Modification of existing Verizon site. Install 5 new antennas and 2 new RRH units, replace 4 RRH units, relocate 2 GPS antennas and 2 satellite dishes on roof. Install 1 new equipment cabinet on roof. All in conformance with TPPN 5/98.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 6-story elevator apartment building built in 1936, with 47 homes, on a 11,000 sq ft lot.
- Built
- 1936
- Last altered
- 2015
- Floors
- 6
- Residential units
- 47
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R5
- Lot area
- 11,000 sq ft
- Building area
- 45,210 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 4 open notices on record for this building, out of 19 notices on file; the most recent was issued Oct 19, 2019.
- Elevator
Issued Oct 19, 2019
- Fail to certify class
Issued Sep 5, 2018 — FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
- (other bldgs types) - elevator affirmation of
Issued Nov 14, 2016 — VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
1 further open notice is on file. Open the source dataset for the full list.
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00337806-P1.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00337806-P1
- BBL
- 3067040032
- Postal code
- 11230 · 1132 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 47
- Proposed dwelling units
- 47