NYC DOB record · B00595222-I1

968 Meeker Avenue

968 Meeker Avenue, Brooklyn, NY 11222

Alteration filing in East Williamsburg, Brooklyn. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 14, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00595222-I1

968 Meeker Avenue

Brooklyn, NY 11222

Alteration filing · status dated Mar 21, 2023

Current record
Approved
Proposed scale
Not stated
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00595222-I1 as a alteration filing at 968 Meeker Avenue, Brooklyn, NY 11222. Its latest published status category is Approved, dated Mar 21, 2023. The published record does not state proposed stories or dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Mar 21, 2023
Proposed scale
Not stated in this filing
The building, not the filingEvery filing at BIN 3069683, with the parcel and violation recordApplicant of recordSee the 95 filings that name The Mtm Design Group, LLC
FiledJul 5, 2022
Current recordApproved
Proposed scaleNot specified
Recorded cost$20,000

What the filing says

A public-record reading of the proposed work.

Verizon - Relocation of gas meter and removal of existing gas piping as needed. Installation of gas pipping as per plans. No change to occupancy, use or egress.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 2-story warehouse built in 1920, on a 20,650 sq ft lot.

Built
1920
Last altered
2008
Floors
2
Residential units
0
Building type
Warehouse
Land use
Industrial and manufacturing
Zoning district
M3-1
Lot area
20,650 sq ft
Building area
20,823 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 15, 2026. They describe the tax lot, not this filing.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00595222-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 75,302 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00595222-I1
BBL
3027970011
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
0
Proposed dwelling units
0
plumbing