NYC DOB record · B00150753-I1

97 North 10 Street

97 North 10 Street, Brooklyn, NY 11249

Alteration filing in Williamsburg, Brooklyn. The latest DOB status is onhold-nogoodcheck.

The filing is paused because a payment did not clear. What every status means

Under reviewAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 11, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00150753-I1

97 North 10 Street

Brooklyn, NY 11249

Alteration filing · status dated May 13, 2022

Current record
Under review
Proposed scale
Not stated
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00150753-I1 as a alteration filing at 97 North 10 Street, Brooklyn, NY 11249. Its latest published status category is Under review, dated May 13, 2022. The published record does not state proposed stories or dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Under review
Latest status date
May 13, 2022
Proposed scale
Not stated in this filing
The building, not the filingthe owner of record and every filing at BIN 3061600
FiledApr 16, 2019
Current recordUnder review
Proposed scaleNot specified
Recorded cost$2,500

What the filing says

A public-record reading of the proposed work.

Construction fence

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 2-story store building built in 1900, on a 18,516 sq ft lot.

Built
1900
Floors
2
Residential units
0
Building type
Store building
Land use
Mixed residential and commercial
Zoning district
M1-2
Lot area
18,516 sq ft
Building area
30,953 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 21, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

No open violations are recorded for this building. 4 notices are on file, all with a recorded resolution.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 21, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00150753-I1.

    01
  2. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    02
  3. Current status updated

    The latest recorded filing status is “OnHold-NoGoodCheck.”

    03

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00150753-I1
BBL
3022960012
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
Empty in the source
Proposed dwelling units
Empty in the source
fence