What the filing says
A public-record reading of the proposed work.
Plumbing work to accommodate renovations of exist. two family home. Work consists of removal, relocation and addition new plumbing fixtures to the Basement, First Floor thru Fourth Floor.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 4-story walk-up apartment building built in 1874, with 3 homes, on a 2,674 sq ft lot.
- Built
- 1874
- Floors
- 4
- Residential units
- 3
- Building type
- Walk-up apartment building
- Land use
- Walk-up apartments
- Zoning district
- R6B
- Lot area
- 2,674 sq ft
- Building area
- 5,774 sq ft
- Historic district
- Prospect Heights Historic District
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 2 notices on file; the most recent was issued Nov 7, 2009.
- Construction
Issued Nov 7, 2009 — BOUROUGH COMMISONER HAS REVIKED APPLICATION#320055765 ON 11/06/09 REMEDY; STOP ALL WORK IMMEDIATELY CINTACT DEPARTMENT OF BUILDINGS FOR THWITH
- Construction
Issued Oct 10, 2009
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00268082-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00268082-I1
- BBL
- 3011430080
- Postal code
- 11217 · 2156 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 2
- Proposed dwelling units
- 2