NYC DOB record · B00622668-A3

975 Nostrand Avenue

975 Nostrand Avenue, Brooklyn, NY 11225

New building filing in Crown Heights (South), Brooklyn. The latest DOB status is approved.

A plan examiner has approved the application. A permit still has to be issued before work can begin. What every status means

ApprovedNew building

NYC Department of Buildings · w9ak-ipjd · accessed Sep 14, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00622668-A3

975 Nostrand Avenue

Brooklyn, NY 11225

New building · status dated Feb 7, 2024

Current record
Approved
Proposed scale
9 stories
Dwelling units
328
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00622668-A3 as a new building at 975 Nostrand Avenue, Brooklyn, NY 11225. Its latest published status category is Approved, dated Feb 7, 2024. The filing records 9 proposed stories and 328 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
New building
Latest status
Approved
Latest status date
Feb 7, 2024
Proposed scale
9 proposed stories and 328 proposed dwelling units
The building, not the filingwhat it sold for and every filing at BIN 3430305Applicant of recordSee the 335 filings that name Ep Engineering LLC
FiledNov 20, 2023
Current recordApproved
Proposed scale9 stories
Recorded cost$1,000

What the filing says

A public-record reading of the proposed work.

New building plumbing in conjunction with application B00622668-I1

Street Futures classifies this record as a new building based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 5-story elevator apartment building built in 2023, with 266 homes, on a 61,621 sq ft lot.

Built
2023
Floors
5
Residential units
266
Building type
Elevator apartment building
Land use
Mixed residential and commercial
Zoning district
R7-1
Lot area
61,621 sq ft
Building area
192,382 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 21, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

No open violations are recorded for this building.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 21, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00622668-A3.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. Current status updated

    The latest recorded filing status is “Approved.”

    03

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,798 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00622668-A3
BBL
3013090006
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
9
Existing dwelling units
Empty in the source
Proposed dwelling units
328
plumbing