NYC DOB record · M01100529-P2

975 Park Avenue

975 Park Avenue, Manhattan, NY 10028

Alteration filing in Upper East Side-Carnegie Hill, Manhattan. The latest DOB status is approved.

A plan examiner has approved the application. A permit still has to be issued before work can begin. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 21, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01100529-P2

975 Park Avenue

Manhattan, NY 10028

Alteration filing · status dated Oct 16, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
30
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01100529-P2 as a alteration filing at 975 Park Avenue, Manhattan, NY 10028. Its latest published status category is Approved, dated Oct 16, 2026. The filing records 30 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Oct 16, 2026
Proposed scale
30 proposed dwelling units
The building, not the filingopen housing violations, what it sold for, apartment sizes and every filing at BIN 1047636Applicant of recordSee the 2 filings that name John Iannacito Architect, PLLC
FiledOct 16, 2026
Current recordApproved
Proposed scale30 units
Recorded cost$55,000

What the filing says

A public-record reading of the proposed work.

Plumbing scope of work to include; new plumbing fixtures , finish and roughing on existing risers. new gas appliances on new roughing on existing gas risers.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 15-story elevator apartment building built in 1929, with 61 homes, on a 11,600 sq ft lot.

Built
1929
Floors
15
Residential units
61
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R10
Lot area
11,600 sq ft
Building area
142,075 sq ft
Historic district
Park Avenue Historic District

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 20, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 11 open notices on record for this building, out of 57 notices on file; the most recent was issued Aug 1, 2024.

  • Failure to correct swarmp conditions (facade)

    Issued Aug 1, 2024 — FAILURE TO CORRECT SWARMP CONDITIONS

  • Hazardous condition (facade)

    Issued Feb 9, 2024 — CYCLE 9C UNSAFE REPORT FILED

  • Construction

    Issued Apr 21, 2020 — PARTIAL SIDWALK SHED REMOVAL. PARTIAL SIDEWALK SHED REMOVAL REQUEST BY QEWI H. ZIMMERMAN WAS SUBMITTED ON 3/11/20 AND WAS ACCEPTED BY THE DEPT. ON 3/26/20. IN THE REQUEST QEWI STATES THAT FACADE DEFECTS ABOVE SIDEWALK SHED WERE REPAIRED AND THE STATEMENT WAS CONFIRMED BY DOB INSPECTOR. REMEDY: REMOVE SIDEWALK SHED IMMEDIATELY

  • 8 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 20, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01100529-P2.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. Current status updated

    The latest recorded filing status is “Approved.”

    03

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 85,681 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01100529-P2
BBL
1015110069
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
30
Proposed dwelling units
30