NYC DOB record · M01455565-I1

975 Park Avenue

975 Park Avenue, Manhattan, NY 10028

Alteration filing in Upper East Side-Carnegie Hill, Manhattan. The latest DOB status is approved.

A plan examiner has approved the application. A permit still has to be issued before work can begin. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 3, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01455565-I1

975 Park Avenue

Manhattan, NY 10028

Alteration filing · status dated Oct 1, 2026

Current record
Approved
Proposed scale
16 stories
Dwelling units
61
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01455565-I1 as a alteration filing at 975 Park Avenue, Manhattan, NY 10028. Its latest published status category is Approved, dated Oct 1, 2026. The filing records 16 proposed stories and 61 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Oct 1, 2026
Proposed scale
16 proposed stories and 61 proposed dwelling units
The building, not the filingopen housing violations, what it sold for, apartment sizes and every filing at BIN 1047636Applicant of recordSee the 8 filings that name Amarchitecture LLC
FiledSep 23, 2026
Current recordApproved
Proposed scale16 stories
Recorded cost$344,550

What the filing says

A public-record reading of the proposed work.

Interior alterations:new partitions,new millwork&enclosures, new molding /trim,new doors, trims&casings;renove bathrooms,new kitchen layout/ appliances. s1 doc filed for plumbing.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 15-story elevator apartment building built in 1929, with 61 homes, on a 11,600 sq ft lot.

Built
1929
Floors
15
Residential units
61
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R10
Lot area
11,600 sq ft
Building area
142,075 sq ft
Historic district
Park Avenue Historic District

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 3, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 11 open notices on record for this building, out of 57 notices on file; the most recent was issued Aug 1, 2024.

  • Failure to correct swarmp conditions (facade)

    Issued Aug 1, 2024 — FAILURE TO CORRECT SWARMP CONDITIONS

  • Hazardous condition (facade)

    Issued Feb 9, 2024 — CYCLE 9C UNSAFE REPORT FILED

  • Construction

    Issued Apr 21, 2020 — PARTIAL SIDWALK SHED REMOVAL. PARTIAL SIDEWALK SHED REMOVAL REQUEST BY QEWI H. ZIMMERMAN WAS SUBMITTED ON 3/11/20 AND WAS ACCEPTED BY THE DEPT. ON 3/26/20. IN THE REQUEST QEWI STATES THAT FACADE DEFECTS ABOVE SIDEWALK SHED WERE REPAIRED AND THE STATEMENT WAS CONFIRMED BY DOB INSPECTOR. REMEDY: REMOVE SIDEWALK SHED IMMEDIATELY

  • 8 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 3, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01455565-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. Current status updated

    The latest recorded filing status is “Approved.”

    03

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 74,561 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01455565-I1
BBL
1015110069
Review type
Standard Plan Examination
Existing stories
16
Proposed stories
16
Existing dwelling units
61
Proposed dwelling units
61
General construction