NYC DOB record · Q01458605-I1

98-10 63 Road

98-10 63 Road, Queens, NY 11374

Alteration filing in Rego Park, Queens. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 15, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · Q01458605-I1

98-10 63 Road

Queens, NY 11374

Alteration filing · status dated Sep 14, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
261
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing Q01458605-I1 as a alteration filing at 98-10 63 Road, Queens, NY 11374. Its latest published status category is Approved, dated Sep 14, 2026. The filing records 261 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Sep 14, 2026
Proposed scale
261 proposed dwelling units
Applicant of recordSee the 275 filings that name Always Fast Services Corp
FiledSep 11, 2026
Current recordApproved
Proposed scale261 units
Recorded cost$1,000

What the filing says

A public-record reading of the proposed work.

Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the NYC building code. live load 300psf.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 22-story elevator apartment building built in 2022, with 260 homes, on a 28,841 sq ft lot.

Built
2022
Last altered
2022
Floors
22
Residential units
260
Building type
Elevator apartment building
Land use
Mixed residential and commercial
Zoning district
R7-1
Lot area
28,841 sq ft
Building area
232,347 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 15, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 3 open notices on record for this building, out of 4 notices on file; the most recent was issued Sep 14, 2026.

  • Construction

    Issued Sep 14, 2026 — MULTIPLE PANELS OF GLASS FACADE HAVE BEEN BROKEN BETWEEN 1/2025 & 7/20 26 PER ENGINEER'S REPORT SUBMITTED TO DOB INDICATING A SYSTEMATIC ISSU E ISSUE WITH GLASS FACADE.REMEDY:QEWI IMMEDIATELY EVALUATE ENTIRE GLAS S FACADE SYSTEM TO SUBMIT REPORT,SUBMIT NAMES OF 3 QEWI'S BY 9/28/2026 SUBMIT REPORT BY 12/14/2026

  • Construction

    Issued Sep 3, 2026 — EMERGENCY WORK ORDER DUE TO DAMAGED & BROKEN GLASS @ GLASS CURTAIN WALL EXHIBITING SIGNS OF POSSIBLE SYSTEM FAILURE INSTANCES OF BROKEN GLASS PANESL FROM MULT FLRS ON MULT EXPOSURES. REMEDY: IMMEDIATELY PROVIDE SIDEWALK SHED & ADEQUATE SAFETY MEASURES TO PROTECT THE PUBLIC ON ALL PUBLIC RIGHT OF WAYS ACCESIBLE AREAS & COURTYARD

  • Construction

    Issued Jun 23, 2026 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. AT TIME OF INSPECTION OBSERVED EXTERIOR TEMPERED GLASS PANE HAS BEEN DAMAGED & SHATTERED FALLING ONTO PUBLICLY ACCESSIBLE AREAS. NOTE: MULTIPLE TEMPERED GLASS PANES HAVE BEEN DAMAGED THROUGHOUT THE YEAR.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 15, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing Q01458605-I1.

    01
  2. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    02
  3. Current status updated

    The latest recorded filing status is “Permit Entire.”

    03

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 62,630 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
Q01458605-I1
BIN
4619563
BBL
4020980005
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
261
Proposed dwelling units
261
Sidewalk shed