NYC DOB record · Q00870365-I1

98-15 Horace Harding Expressway

98-15 Horace Harding Expressway, Queens, NY 11368

Alteration filing in Corona, Queens. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 29, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · Q00870365-I1

98-15 Horace Harding Expressway

Queens, NY 11368

Alteration filing · status dated Oct 27, 2026

Current record
Recorded as completed
Proposed scale
16 stories
Dwelling units
225
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing Q00870365-I1 as a alteration filing at 98-15 Horace Harding Expressway, Queens, NY 11368. Its latest published status category is Recorded as completed, dated Oct 27, 2026. The filing records 16 proposed stories and 225 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Oct 27, 2026
Proposed scale
16 proposed stories and 225 proposed dwelling units
Applicant of recordSee the 11 filings that name Seth P. Roye Architect PC
FiledApr 29, 2024
Current recordRecorded as completed
Proposed scale16 stories
Recorded cost$1.4M

What the filing says

A public-record reading of the proposed work.

Balcony restoration work and masonry facade work as per plans. No change to use, egress, or occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 16-story elevator apartment building built in 1966, with 227 homes, on a 51,475 sq ft lot.

Built
1966
Last altered
2015
Floors
16
Residential units
227
Building type
Elevator apartment building
Land use
Mixed residential and commercial
Zoning district
R6
Lot area
51,475 sq ft
Building area
235,000 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 29, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

No open violations are recorded for this building. 42 notices are on file, all with a recorded resolution.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 29, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing Q00870365-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 88,832 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
Q00870365-I1
BIN
4047332
BBL
4019180097
Review type
Professional Certification
Existing stories
16
Proposed stories
16
Existing dwelling units
225
Proposed dwelling units
225
General construction