What the filing says
A public-record reading of the proposed work.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the NYC building code. no change in use, occupancy, or egress under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 4-story walk-up apartment building built in 1931, with 32 homes, on a 12,000 sq ft lot.
- Built
- 1931
- Last altered
- 1989
- Floors
- 4
- Residential units
- 32
- Building type
- Walk-up apartment building
- Land use
- Walk-up apartments
- Zoning district
- R6B
- Lot area
- 12,000 sq ft
- Building area
- 38,000 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 10, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 3 open notices on record for this building, out of 8 notices on file; the most recent was issued Nov 26, 2025.
- Construction
Issued Nov 26, 2025 — ATOI, OBSERVED APPROXIMATE 1X2 FT HOLE IN KITCHEN OF APT. 1C. FLOORING IS LOOSE AND JOISTS ARE EXPOSED AND DAMAGED FROM FIRE AND WATER. SECTION OF CELLAR CEILING APPROXIMATELY 2X4 FT COLLAPSE AND EXPOSED CREATING A FIRE HAZARD UNDER APT 1C., STRUCTURALLY COMPRISING THE BUILDING.
- Local law 62/91 - boilers
Issued Aug 16, 1993
- Local law 62/91 - boilers
Issued Aug 16, 1993
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 10, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B01431163-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 78,679 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B01431163-I1
- BBL
- 3016220034
- Postal code
- 11221 · 3277 filings
- Review type
- Professional Certification
- Existing stories
- 4
- Proposed stories
- 4
- Existing dwelling units
- 16
- Proposed dwelling units
- 16