What the filing says
A public-record reading of the proposed work.
Installation of new fire sprinkler system with valves and meters for same
Street Futures classifies this record as a new building based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
Violation record
Are there open violations here?
No open violations are recorded for this building.
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 11, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing S01343131-S1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- S01343131-S1
- BBL
- Empty in the source
- Postal code
- 10309 · 121 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- 3
- Existing dwelling units
- Empty in the source
- Proposed dwelling units
- 2