NYC DOB record · M01180786-I1

99 Reade Street

99 Reade Street, Manhattan, NY 10013

Alteration filing in Tribeca-Civic Center, Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Nov 6, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01180786-I1

99 Reade Street

Manhattan, NY 10013

Alteration filing · status dated Nov 4, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
20
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01180786-I1 as a alteration filing at 99 Reade Street, Manhattan, NY 10013. Its latest published status category is Approved, dated Nov 4, 2026. The filing records 20 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Nov 4, 2026
Proposed scale
20 proposed dwelling units
The building, not the filingopen housing violations, apartment sizes, the owner of record and every filing at BIN 1001589Applicant of recordSee the 51 filings that name Elevated Engineering, PLLC
FiledAug 25, 2025
Current recordApproved
Proposed scale20 units
Recorded cost$10,200

What the filing says

A public-record reading of the proposed work.

Modification to T-Mobile site. Replace 6 antennas on the roof. Retrofit 1 existing cabinet in the basement. Related service connection in the basement.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 7-story condominium built in 1862, with 20 homes, on a 5,600 sq ft lot.

Built
1862
Floors
7
Residential units
20
Building type
Condominium
Land use
Mixed residential and commercial
Zoning district
C6-3A
Lot area
5,600 sq ft
Building area
36,546 sq ft
Historic district
Tribeca South Historic District

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 6, 2026. They describe the tax lot, not this filing.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01180786-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 92,577 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01180786-I1
BBL
1001457504
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
20
Proposed dwelling units
20