What the filing says
A public-record reading of the proposed work.
Minor plumbing work associated with application# 322027089. no change in occupancy use or egress.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 3-story mainly residential with some commercial built in 1931, on a 1,324 sq ft lot.
- Built
- 1931
- Floors
- 3
- Residential units
- 2
- Building type
- Mainly residential with some commercial
- Land use
- Mixed residential and commercial
- Zoning district
- R7A
- Lot area
- 1,324 sq ft
- Building area
- 3,205 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 4 open notices on record for this building, out of 7 notices on file; the most recent was issued Nov 10, 2025.
- Construction
Issued Nov 10, 2025 — EMERGENCY WORK ORDER.FIRE DMG ON THE 1STRY REAR EXTENSION OF THE BLDG@ EXP3.1STFL JOISTS THE 1STRY EXTENSION WERE SEVERELY CHARRED&ROOF OF THE EXTENSN WAS PRTLLY OPEN.BRKN GLASS PIECES OF WNDW ON EXP1.OWNR TO IMMED INSTLL SDWLK SHED ALNG THE ENT EXP1 ON MANHATTAN AVE AND EXPOSURE 2 ON HURON STREET
- Construction
Issued Nov 10, 2025 — EMERGENCY WORK ORDER.1STRY EXTSN@REAR WAS DMGD BY FIRE ON 11/9/25.2ND FL EXP3 WOOD SPANDREL SEVERELY CHARRD.ROOF FRAMNG&THE 1STRY EXTNSN @ EXP3 SEVERELY CHARRD.3RDFL BALCNY@EXP3 WAS SPPRTD ON THE CMPRMSD.UNDR DRCT&CNTINUOUS SPRVSN OF PE IMMED:1.DEMO THE EXP3 BALCNY &SEAL ALL DOORS LEADNG TO THE BLCNY,2.SHORE&BRACE EXP3 WALL
- Construction
Issued Nov 9, 2025 — DAMAGE TO BUILDING FROM FIRE ON LEVELS 1-3 STRUTURAL DAMAGE TO WOOD FR AME OF BUILDING FROM FIRE AND WATER OWNWER TO HIRE NYSPE TO SUBMIT REPORT WITH PLANS ,PHOTOS AND REPAIR PA LS TO ERTINSPECTIONS@BUILDINGS.NYC.GOV 718-286-3460 WITHIN 7 DAYS
1 further open notice is on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00396016-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded05
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00396016-I1
- BIN
- 3064150
- BBL
- 3025220047
- Postal code
- 11222 · 3247 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 1
- Proposed dwelling units
- 2








