DOB filing M01243599-I1
Alteration filing at 568 Broadway
Building record · BIN 1007942
568 Broadway, Manhattan, NY 10012
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 17 independently sourced records, including 15 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 1007942
568 Broadway
Soho-Little Italy-Hudson Square, Manhattan
A consolidated public-record view · updated Nov 9, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 12-story office building built in 1897, on a 23,700 sq ft lot.
Owner of record
568 BROADWAY PROPERTY LLC
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 12, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
The Department of Buildings has 11 open notices on record for this building, out of 167 notices on file; the most recent was issued Feb 22, 2024.
Issued Feb 22, 2024 — FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
Issued Apr 22, 2023 — FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 IN 2022
Issued Apr 29, 2021 — FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
8 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 27, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1007942. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 17 alteration filing. Its latest status categories are 15 approved, 2 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 568 Broadway.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 17 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Renovation of existing lobbies and 6th floor commercial spaces. Filing M01152229-I1.
Filing M01152229-I1 reached an approved status.
DOB lists a first permit date for M01152229-I1. That is not by itself confirmation of activity on site.
Structural work as shown on plans. Filing M01152229-S1.
Filing M01152229-S1 reached an approved status.
Mechanical work as shown on plans filed herewith. Filing M01152229-S2.
Filing M01152229-S2 reached an approved status.
DOB lists a first permit date for M01152229-S2. That is not by itself confirmation of activity on site.
Demolition/General Construction as shown on plans filed herewith. No change in use, egress or occupancy. Filing M01243599-I1.
Storefront alterations as shown on plans filed herewith. No change in use, egress or occupancy. Filing M01250654-I1.
Filing M01243599-I1 reached an approved status.
DOB lists a first permit date for M01243599-I1. That is not by itself confirmation of activity on site.
Installation of a heavy duty sidewalk shed as per plans during general construction work. no change in use, egress or occupancy. sidewalk shed to comply with chapter 33 of NYC building code of 2022. Filing M01274048-I1.
DOB lists a first permit date for M01274048-I1. That is not by itself confirmation of activity on site.
Structural work as shown on plans filed herewith. No change in use, egress or occupancy. Filing M01263986-I1.
Filing M01263986-I1 reached an approved status.
Filing M01250654-I1 reached an approved status.
DOB lists a first permit date for M01250654-I1. That is not by itself confirmation of activity on site.
Mechanical work as shown on plans. No change in use, egress or occupancy. Filing M01221633-I1.
Demolition/General Construction as shown on plans filed herewith. No change in use, egress or occupancy. Filing M01285557-I1.
Filing M01221633-I1 reached an approved status.
Installation of a system scaffold for landing platform as per plans. no change in use, egress or occupancy. scaffold shall comply with 2022 NYC building code, chapter 33. Filing M01308387-I1.
DOB lists a first permit date for M01308387-I1. That is not by itself confirmation of activity on site.
Filing M01285557-I1 reached an approved status.
DOB lists a first permit date for M01221633-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01285557-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01152229-S1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01263986-I1. That is not by itself confirmation of activity on site.
Sprinkler work in conjunction with office renovation. Filing M01346240-S3.
Plumbing work in conjunction with office renovation. Filing M01346240-S2.
Mechanical work in conjunction with office renovation. Filing M01346240-S1.
Filing M01346240-S3 reached an approved status.
Filing M01346240-S2 reached an approved status.
Filing M01346240-S1 reached an approved status.
DOB lists a first permit date for M01346240-S1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01346240-S3. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01346240-S2. That is not by itself confirmation of activity on site.
Demolition/General Construction as shown on plans filed herewith. No change in use, egress or occupancy. Filing M01395841-I1.
Filing M01395841-I1 reached an approved status.
The latest status recorded for M01274048-I1 is “Permit Entire.”
Mechanical work in conjunction with office renovation. Filing M01346240-P2.
Plumbing work in conjunction with office renovation. Filing M01346240-P3.
Sprinkler work in conjunction with office renovation. Filing M01346240-P4.
Filing M01346240-P3 reached an approved status.
The latest status recorded for M01346240-P3 is “Approved.”
Filing M01346240-P4 reached an approved status.
The latest status recorded for M01346240-P4 is “Approved.”
Filing M01346240-P2 reached an approved status.
The latest status recorded for M01346240-P2 is “Approved.”
The latest status recorded for M01346240-S1 is “Permit Entire.”
The latest status recorded for M01308387-I1 is “Permit Entire.”
DOB recorded a sign-off for M01346240-S3.
The latest status recorded for M01346240-S3 is “LOC Issued.”
DOB recorded a sign-off for M01346240-S2.
The latest status recorded for M01346240-S2 is “LOC Issued.”
The latest status recorded for M01250654-I1 is “Permit Entire.”
The latest status recorded for M01152229-I1 is “Permit Entire.”
The latest status recorded for M01152229-S1 is “Permit Entire.”
The latest status recorded for M01221633-I1 is “Permit Entire.”
The latest status recorded for M01263986-I1 is “Permit Entire.”
The latest status recorded for M01152229-S2 is “Permit Entire.”
The latest status recorded for M01285557-I1 is “Permit Entire.”
The latest status recorded for M01243599-I1 is “Permit Entire.”
DOB lists a first permit date for M01395841-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01395841-I1 is “Permit Entire.”