What the filing says
A public-record reading of the proposed work.
Sprinkler work in conjunction with office renovation
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 12-story office building built in 1897, on a 23,700 sq ft lot.
- Built
- 1897
- Last altered
- 2010
- Floors
- 12
- Residential units
- 0
- Building type
- Office building
- Land use
- Commercial and office
- Zoning district
- M1-5/R9X
- Lot area
- 23,700 sq ft
- Building area
- 286,250 sq ft
- Historic district
- SoHo-Cast Iron Historic District
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 20, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 11 open notices on record for this building, out of 167 notices on file; the most recent was issued Feb 22, 2024.
- No report and / or late filing (facade)
Issued Feb 22, 2024 — FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
- Failure to submit
Issued Apr 22, 2023 — FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 IN 2022
- Failure to post energy
Issued Apr 29, 2021 — FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
8 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 20, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01346240-S3.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01346240-S3
- BBL
- 1005110001
- Postal code
- 10012 · 316 filings
- Review type
- Professional Certification
- Existing stories
- 12
- Proposed stories
- 12
- Existing dwelling units
- 0
- Proposed dwelling units
- 0








