Building record · BIN 1012047

155 Bank Street

155 Bank Street, Manhattan, NY 10014

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 17 independently sourced records, including 16 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 1012047

155 Bank Street

West Village, Manhattan

A consolidated public-record view · updated Nov 19, 2026

DOB filings
17
Active-status
16
Recorded addresses
3
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings17
Open or active-status records16
First included filingOct 18, 2024
Latest recorded changeNov 19, 2026

The lot

What is already here?

  1. Floors 9–18Above the southern skylineAbove the tallest building within sixty metres to the south, which stands 26.9 m. Nothing on that side reaches this floor.
  2. Floors 2–8Nothing on record
  3. Floor 1Street levelStreet level.
  • Street levelThe way in
  • Above the southern skylineFrom about floor 9 — the tallest thing within 60 m to the south is 26.9 m
Drawn from the outline and roof height the Department of City Planning publishes for this building: 54.4 m over about 18 floors, counted at three metres each because the city publishes the height and not the number. 2 runs of floors have something on record. The city publishes a roof height and a storey count for the lot, and nothing at all about any individual floor. What stands to the south is measured from the city’s own footprints and roof heights; it is a statement about the skyline, not a calculation of sunlight.

Violation record

Are there open violations here?

The Department of Buildings has 23 open notices on record for this building, out of 171 notices on file; the most recent was issued Nov 14, 2025.

  • Low pressure boiler

    Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION

  • Low pressure boiler

    Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION

  • Low pressure boiler

    Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION

  • 20 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 20, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1012047. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 17 alteration filing. Its latest status categories are 5 under review, 11 approved, 1 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Oct 18, 2024
Latest recorded change
Nov 19, 2026
Highest proposed story count
13 stories
Highest proposed unit count
384 dwelling units

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 155 Bank Street.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 17 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Interior cellar renovations of lounge, room, showers and toilets and locker rooms, first floor office and single used toilet room. Filing M01114719-I1.

    01
  2. Alteration filed

    Installation of new steel framing and concrete ramp. Filing M01113570-S1.

    02
  3. Alteration filed

    Installation of sprinkler heads at cellar level. Filing M01114719-S3.

    03
  4. Alteration filed

    Replacement of existing fire standpipe and installation of new 6" fire service to support fire pump. Filing M01114719-S4.

    04
  5. Alteration filed

    Plumbing fixture installation at the cellar and first floor. Filing M01114719-S2.

    05
  6. Alteration filed

    Installation of new HVAC equipment and ductwork. Filing M01114719-S1.

    06
  7. Alteration filed

    Restoration of fire-rated demising walls, ceilings, shaft walls, and partitions following abatement (by others), including direct replacement of fixtures and finishes throughout 22 vacant residential apartment units. Filing M01121893-I1.

    07
  8. Alteration approved

    Filing M01121893-I1 reached an approved status.

    08
  9. Alteration filed

    Limited removal & replacement of existing millwork & lighting, including installation of new security desk and mail package enclosure. Filing M01121899-I1.

    09
  10. Alteration approved

    Filing M01121899-I1 reached an approved status.

    010
  11. Alteration filed

    Mechanical application related to elevator modernization scope. Filing M01144519-I1.

    011
  12. Alteration approved

    Filing M01114719-S1 reached an approved status.

    012
  13. Alteration approved

    Filing M01114719-S4 reached an approved status.

    013
  14. Alteration approved

    Filing M01114719-S2 reached an approved status.

    014
  15. Alteration approved

    Filing M01114719-S3 reached an approved status.

    015
  16. Alteration approved

    Filing M01144519-I1 reached an approved status.

    016
  17. Alteration approved

    Filing M01113570-S1 reached an approved status.

    017
  18. Alteration filed

    Installation of suspended scaffold for facade work or inspection. Filing M01181311-I1.

    018
  19. Alteration approved

    Filing M01181311-I1 reached an approved status.

    019
  20. Permit recorded for alteration

    DOB lists a first permit date for M01181311-I1. That is not by itself confirmation of activity on site.

    020
  21. Alteration approved

    Filing M01114719-I1 reached an approved status.

    021
  22. Permit recorded for alteration

    DOB lists a first permit date for M01121899-I1. That is not by itself confirmation of activity on site.

    022
  23. Permit recorded for alteration

    DOB lists a first permit date for M01121893-I1. That is not by itself confirmation of activity on site.

    023
  24. Permit recorded for alteration

    DOB lists a first permit date for M01144519-I1. That is not by itself confirmation of activity on site.

    024
  25. Permit recorded for alteration

    DOB lists a first permit date for M01114719-S3. That is not by itself confirmation of activity on site.

    025
  26. Permit recorded for alteration

    DOB lists a first permit date for M01114719-S2. That is not by itself confirmation of activity on site.

    026
  27. Permit recorded for alteration

    DOB lists a first permit date for M01114719-S1. That is not by itself confirmation of activity on site.

    027
  28. Permit recorded for alteration

    DOB lists a first permit date for M01114719-I1. That is not by itself confirmation of activity on site.

    028
  29. Alteration filed

    Interior renovation of existing mechanical room. Filing M01370413-I1.

    029
  30. Alteration filed

    Interior cellar renovations of lounge, room, showers and toilets and locker rooms, first floor office and single used toilet room. Filing M01114719-P1.

    030
  31. Alteration filed

    Structural work filed for the integration of steel-framed slab on metal deck floor within existing building. No change in use, occupancy or egress. Filing M01448137-I1.

    031
  32. Alteration approved

    Filing M01448137-I1 reached an approved status.

    032
  33. Alteration filed

    Installation of suspended scaffold for facade work or inspection. Filing M01181311-P4.

    033
  34. Permit recorded for alteration

    DOB lists a first permit date for M01114719-S4. That is not by itself confirmation of activity on site.

    034
  35. Alteration now approved

    The latest status recorded for M01144519-I1 is “Permit Entire.”

    035
  36. Alteration now approved

    The latest status recorded for M01114719-S1 is “Permit Entire.”

    036
  37. Alteration now approved

    The latest status recorded for M01114719-I1 is “Permit Entire.”

    037
  38. Alteration approved

    Filing M01181311-P4 reached an approved status.

    038
  39. Alteration now approved

    The latest status recorded for M01181311-P4 is “Approved.”

    039
  40. Alteration now approved

    The latest status recorded for M01181311-I1 is “Permit Entire.”

    040
  41. Alteration now approved

    The latest status recorded for M01121893-I1 is “Permit Entire.”

    041
  42. Permit recorded for alteration

    DOB lists a first permit date for M01448137-I1. That is not by itself confirmation of activity on site.

    042
  43. Alteration now approved

    The latest status recorded for M01448137-I1 is “Permit Entire.”

    043
  44. Alteration filed

    Interior cellar renovations of sculpture studio. No change in use, occupancy or egress. Filing M01422376-I1.

    044
  45. Alteration now under review

    The latest status recorded for M01422376-I1 is “Plan Examiner Review.”

    045
  46. Alteration signed off

    DOB recorded a sign-off for M01121899-I1.

    046
  47. Alteration now completed

    The latest status recorded for M01121899-I1 is “LOC Issued.”

    047
  48. Alteration now under review

    The latest status recorded for M01114719-P1 is “Plan Examiner Review.”

    048
  49. Permit recorded for alteration

    DOB lists a first permit date for M01113570-S1. That is not by itself confirmation of activity on site.

    049
  50. Alteration now approved

    The latest status recorded for M01113570-S1 is “Permit Entire.”

    050
  51. Alteration filed

    Structural scope filed for interior renovation of mechanical room. No change in use, occupancy or egress. Filing M01422376-S1.

    051
  52. Alteration now under review

    The latest status recorded for M01422376-S1 is “Pending Plan Examiner Assignment.”

    052
  53. Alteration now under review

    The latest status recorded for M01370413-I1 is “Plan Examiner Review.”

    053
  54. Alteration now approved

    The latest status recorded for M01114719-S4 is “Permit Entire.”

    054
  55. Alteration now approved

    The latest status recorded for M01114719-S3 is “Permit Entire.”

    055
  56. Alteration now approved

    The latest status recorded for M01114719-S2 is “Permit Entire.”

    056
  57. Alteration filed

    Fuel/oil tank roof fan removal and Installation of RTU unit. Filing M01113570-P6.

    057
  58. Alteration now under review

    The latest status recorded for M01113570-P6 is “Plan Examiner Review.”

    058