NYC DOB record · M01114719-S4

155 Bank Street

155 Bank Street, Manhattan, NY 10014

Alteration filing in West Village, Manhattan. The latest DOB status is on hold - pending supersede of applicant of record.

The filing is paused until an administrative step is completed. It has not been rejected. What every status means

Under reviewAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Nov 6, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01114719-S4

155 Bank Street

Manhattan, NY 10014

Alteration filing · status dated Nov 4, 2026

Current record
Under review
Proposed scale
13 stories
Dwelling units
384
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01114719-S4 as a alteration filing at 155 Bank Street, Manhattan, NY 10014. Its latest published status category is Under review, dated Nov 4, 2026. The filing records 13 proposed stories and 384 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Under review
Latest status date
Nov 4, 2026
Proposed scale
13 proposed stories and 384 proposed dwelling units
The building, not the filingopen housing violations and every filing at BIN 1012047Applicant of recordSee the 84 filings that name Collado Engineering
FiledOct 25, 2024
Current recordUnder review
Proposed scale13 stories
Recorded cost$35,000

What the filing says

A public-record reading of the proposed work.

Replacement of existing fire standpipe and installation of new 6" fire service to support fire pump

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

Violation record

Are there open violations here?

The Department of Buildings has 23 open notices on record for this building, out of 171 notices on file; the most recent was issued Nov 14, 2025.

  • Low pressure boiler

    Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION

  • Low pressure boiler

    Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION

  • Low pressure boiler

    Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION

  • 20 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 4, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01114719-S4.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “On Hold - Pending Supersede of Applicant of Record.”

    04

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 97,160 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01114719-S4
BBL
1006390001
Review type
Standard Plan Examination
Existing stories
13
Proposed stories
13
Existing dwelling units
384
Proposed dwelling units
384