DOB filing M00879385-I1
Full demolition at 37 West 57 Street
Building record · BIN 1035066
37 West 57 Street, Manhattan, NY 10019
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 38 independently sourced records, including 28 that are not recorded as completed, closed or withdrawn.
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a vacant land on a 5,857 sq ft lot.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 7, 2026. They describe the tax lot, not any single filing.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1035066. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 7 full demolition, 31 alteration filing. Its latest status categories are 10 recorded as completed, 28 approved. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 37 West 57 Street.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 38 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Installation of pipe scaffold as per plans. no change in use, egress or occupancy. Filing M00037207-I1.
DOB lists a first permit date for M00037207-I1. That is not by itself confirmation of activity on site.
Installation of pipe scaffold at 37 west 57 street as indicated on plans. there will be no change in the use, egress, or occupancy under this application. Filing M00061056-I1.
DOB lists a first permit date for M00061056-I1. That is not by itself confirmation of activity on site.
Installation of pipe scaffold at 37 west 57 street as indicated on plans. there will be no change in the use, egress, or occupancy under this application. Filing M00061056-P1.
Filing M00061056-P1 reached an approved status.
Modification to existing Verizon telecommunications site. Replace 1 antenna on roof. All in conformance with TPPN 5/98. No change in use, egress, or occupancy. Filing M00072254-I1.
Filing M00072254-I1 reached an approved status.
DOB lists a first permit date for M00072254-I1. That is not by itself confirmation of activity on site.
DOB recorded a sign-off for M00072254-I1.
DOB recorded a sign-off for M00037207-I1.
The latest status recorded for M00037207-I1 is “LOC Issued.”
The latest status recorded for M00061056-I1 is “Permit Entire.”
The latest status recorded for M00061056-P1 is “Approved.”
The latest status recorded for M00072254-I1 is “LOC Issued.”
Installation and removal of sprinkler fixtures along with related piping. Filing M00569358-I1.
Installation of plumbing fixtures along with related piping. Filing M00569381-I1.
ASSOCIATED DUCTWORK IS TO BE DEMOLISHED BACK MECHANICAL ROOM WALL and installation of steam radiators. Filing M00569337-I1.
Installation and removal of interior partitions, ceilings and doors. Filing M00569729-I1.
Filing M00569358-I1 reached an approved status.
Filing M00569729-I1 reached an approved status.
Filing M00569381-I1 reached an approved status.
Filing M00569337-I1 reached an approved status.
DOB lists a first permit date for M00569337-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M00569337-I1 is “Permit Entire.”
DOB lists a first permit date for M00569729-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M00569729-I1 is “Permit Entire.”
DOB lists a first permit date for M00569381-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M00569381-I1 is “Permit Entire.”
Installation and removal of sprinkler fixtures along with related piping. Filing M00714346-I1.
Renovation of 6th floor interior as per plans herein. no change to use, egress or occupancy. Filing M00709140-I1.
Filing M00709140-I1 reached an approved status.
Installation and remove interior duct work. Filing M00714320-I1.
Installation and removal of plumbing fixtures along with related piping. Filing M00714330-I1.
Filing M00714346-I1 reached an approved status.
Filing M00714320-I1 reached an approved status.
Filing M00714330-I1 reached an approved status.
DOB lists a first permit date for M00714346-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M00714330-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M00714330-I1 is “Permit Entire.”
DOB lists a first permit date for M00714320-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M00714320-I1 is “Permit Entire.”
Installation of plumbing fixtures along with related piping. Filing M00735662-I1.
Installation of duct work along with mechanical unit. Filing M00735611-I1.
Filing M00735662-I1 reached an approved status.
Installation of sprinkler fixtures along with related piping. Filing M00735638-I1.
Installation of interior partitions, ceilings, and doors. Filing M00735587-I1.
Filing M00735638-I1 reached an approved status.
Filing M00735587-I1 reached an approved status.
DOB lists a first permit date for M00709140-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M00709140-I1 is “Permit Entire.”
DOB lists a first permit date for M00735587-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M00735587-I1 is “Permit Entire.”
DOB lists a first permit date for M00735662-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M00735638-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M00735638-I1 is “Permit Entire.”
Filing M00735611-I1 reached an approved status.
DOB lists a first permit date for M00735611-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M00735611-I1 is “Permit Entire.”
DOB lists a first permit date for M00569358-I1. That is not by itself confirmation of activity on site.
Installation of mechanical duct work. Filing M00705835-I1.
INTERIOR RENOVATION TO EXISTING OFFICE SPACE . INCLUDES THE INSTALLATION AND SELECTIVE DEMOLITION OF NON LOAD BEARING PARTITIONS AND RELATED FINISHES. NO CHANGE IN EGRESS, USE OR OCCUPANCY. Filing M00705804-I1.
Filing M00705835-I1 reached an approved status.
Filing M00705804-I1 reached an approved status.
DOB lists a first permit date for M00705835-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M00705835-I1 is “Permit Entire.”
DOB lists a first permit date for M00705804-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M00705804-I1 is “Permit Entire.”
The latest status recorded for M00735662-I1 is “Permit Entire.”
The latest status recorded for M00714346-I1 is “Permit Entire.”
Full demolition of 12 story structure, using hand held and mechanical means to assist from roof to 1st floor. Filing M00879385-I1.
Use of mechanical means to assist with full demolition. Filing M00879385-S1.
The latest status recorded for M00569358-I1 is “Permit Entire.”
Filing M00879385-S1 reached an approved status.
Chute will be installed in accordance to approved demolition plans. Filing M00879385-S2.
Filing M00879385-S2 reached an approved status.
FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS, SEE ATTACHED PLANS Designated Primary Site supervisor: Kenneth Cole. Filing M00967177-I1.
Filing M00967177-I1 reached an approved status.
DOB lists a first permit date for M00967177-I1. That is not by itself confirmation of activity on site.
Decommission of existing vzw site. remove 12 antennas, 9 rrh, 4 gps equipment platfrom and dunnage from the roof. remove cables from basement 1-12 and roof. no change in use, egress or occupancy. original app # 120217844. Filing M01009312-I1.
Filing M01009312-I1 reached an approved status.
DOB lists a first permit date for M01009312-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01009312-I1 is “Permit Entire.”
Filing M00879385-I1 reached an approved status.
DOB recorded a sign-off for M00967177-I1.
The latest status recorded for M00967177-I1 is “LOC Issued.”
Interior non-structural removals in conjunction with full budiling demolition under separate application. there is no change to use, egress, or occupancy. Filing M01104521-I1.
Filing M01104521-I1 reached an approved status.
DOB lists a first permit date for M01104521-I1. That is not by itself confirmation of activity on site.
Removal of sprinkler system and conversion of standpipe system to dry pressurized system in association with full buidling demolition, by others. there is no change to use, egress, or occupancy. Filing M01104233-I1.
Filing M01104233-I1 reached an approved status.
Construction fence will be installed to protect site, and in accordance with approved full demolition plans. Filing M00879385-S3.
Filing M00879385-S3 reached an approved status.
DOB lists a first permit date for M00879385-S3. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01104233-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01104233-I1 is “Permit Entire.”
Installation of 6000 lb single personnel/material hoist car as per plans during construction. hoist shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application. Filing M01138010-I1.
DOB lists a first permit date for M01138010-I1. That is not by itself confirmation of activity on site.
Installation of temporary needle beam as per plans. no change in use, egress or occupancy shall comply with chapter#33 of 2022 the ny building code. Filing M01138173-I1.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the NYC building code. live load 300psf. Filing M01138256-I1.
Proposed installation of temporary light duty pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the NYC building code. no change in use, occupancy, or egress under this application. Filing M01138386-I1.
DOB lists a first permit date for M01138173-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01138256-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01138386-I1. That is not by itself confirmation of activity on site.
Proposed installation of temporary light duty pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the NYC building code. no change in use, occupancy, or egress under this application. Filing M01138386-P1.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the NYC building code. live load 300psf. Filing M01138256-P1.
Installation of temporary needle beam as per plans. no change in use, egress or occupancy shall comply with chapter#33 of 2022 the ny building code. Filing M01138173-P1.
Filing M01138173-P1 reached an approved status.
The latest status recorded for M01138173-P1 is “Approved.”
Filing M01138256-P1 reached an approved status.
The latest status recorded for M01138256-P1 is “Approved.”
Filing M01138386-P1 reached an approved status.
The latest status recorded for M01138386-P1 is “Approved.”
Installation of 6000 lb single personnel/material hoist car as per plans during construction. hoist shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application. Filing M01138010-P1.
Filing M01138010-P1 reached an approved status.
The latest status recorded for M01138010-P1 is “Approved.”
Full demolition of 12 story structure, using hand held and mechanical means to assist from roof to 1st floor. Filing M00879385-P1.
Filing M00879385-P1 reached an approved status.
Chute will be installed in accordance to approved demolition plans. Filing M00879385-P2.
Filing M00879385-P2 reached an approved status.
The latest status recorded for M01104521-I1 is “Permit Entire.”
DOB lists a first permit date for M00879385-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M00879385-S1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M00879385-S2. That is not by itself confirmation of activity on site.
Full demolition of 12 story structure, using hand held and mechanical means to assist from roof to 1st floor. Filing M00879385-P3.
Installation of temporary needle beam as per plans. no change in use, egress or occupancy shall comply with chapter#33 of 2022 the ny building code. Filing M01138173-P2.
Filing M01138173-P2 reached an approved status.
The latest status recorded for M01138173-P2 is “Approved.”
Filing M00879385-P3 reached an approved status.
The latest status recorded for M01138010-I1 is “Permit Entire.”
The latest status recorded for M01138173-I1 is “Permit Entire.”
The latest status recorded for M01138256-I1 is “Permit Entire.”
The latest status recorded for M01138386-I1 is “Permit Entire.”
DOB recorded a sign-off for M00879385-I1.
The latest status recorded for M00879385-I1 is “LOC Issued.”
The latest status recorded for M00879385-P1 is “Full Demolition Signed-off.”
The latest status recorded for M00879385-P2 is “Full Demolition Signed-off.”
The latest status recorded for M00879385-P3 is “Full Demolition Signed-off.”
The latest status recorded for M00879385-S1 is “Full Demolition Signed-off.”
The latest status recorded for M00879385-S2 is “Full Demolition Signed-off.”
The latest status recorded for M00879385-S3 is “Full Demolition Signed-off.”