What the filing says
A public-record reading of the proposed work.
Full demolition of 12 story structure, using hand held and mechanical means to assist from roof to 1st floor.
Street Futures classifies this record as a full demolition based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M00879385-P1.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Full Demolition Signed-off.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 94,142 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M00879385-P1
- BBL
- 1012730012
- Postal code
- 10019 · 1277 filings
- Review type
- Standard Plan Examination
- Existing stories
- 13
- Proposed stories
- Empty in the source
- Existing dwelling units
- 0
- Proposed dwelling units
- Empty in the source