Building record · BIN 1035353

511 5 Avenue

511 5 Avenue, Manhattan, NY 10017

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 20 independently sourced records, including 18 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 1035353

511 5 Avenue

Midtown-Times Square, Manhattan

A consolidated public-record view · updated Oct 30, 2026

DOB filings
20
Active-status
18
Recorded addresses
2
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings20
Open or active-status records18
First included filingSep 14, 2020
Latest recorded changeOct 30, 2026

The lot

What is already here?

The lot holds a 17-story office building built in 1917, on a 7,735 sq ft lot.

  1. Floors 2–17Nothing on record
  2. Floor 1Street levelStreet level. The lot is recorded as commercial and office, so this floor is where the commercial space is.
  • Street levelCommercial and office
  • Above the southern skylineFrom about floor 51 — the tallest thing within 60 m to the south is 150.6 m
Drawn from the outline and roof height the Department of City Planning publishes for this building: 78.3 m over 17 floors, as the city counts them. 1 run of floors has something on record. The city publishes a roof height and a storey count for the lot, and nothing at all about any individual floor. What stands to the south is measured from the city’s own footprints and roof heights; it is a statement about the skyline, not a calculation of sunlight.
Built
1917
Last altered
1983
Floors
17
Residential units
0
Building type
Office building
Land use
Commercial and office
Zoning district
C5-3
Lot area
7,735 sq ft
Building area
125,632 sq ft

Owner of record

511 FIFTH AVENUE LLC

As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 5, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

Violation record

Are there open violations here?

The Department of Buildings has 13 open notices on record for this building, out of 115 notices on file; the most recent was issued Feb 19, 2026.

  • Construction

    Issued Feb 19, 2026 — FTM BLDG. OBSERVED ON EXP 2 CRACKS IN LINTEL AT 2ND FLOOR; OPEN MORTAR JOINTS AND CRACK IN WATER TABLE MASONARY. EXP 3; DAMAGED SPALLED STONE ABOVE HEAD HEIGHT TO THE RIGHT OF REAR ENTRANCE. REMEDY: REPAIR AND/OR REPLACE

  • Construction

    Issued Sep 20, 2024 — EMERGENCY WORK ORDER DUE TO CRACK DETERIORATION OF DECORATIVE STONE @ 2ND FL CORNICE OF EXPOSURE 2 NORTH ELEVATION LOCATION AT EAST & WEST CORNER. REMEDY: IMMEDIATELY INSTALL PUBLIC PROTECTION AT NORTH, EAST & WEST CORNER. MAKE IMMEDIATE REPAIRS UNDER SUPERVISION OF NYC LICENSED PROFESSIONAL

  • Construction

    Issued Sep 20, 2024 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. OBSERVED AT EXPOSURE 2 NORTH ELEVATION AT 2 FLOOR CORNICE. CRACKS STONE CORNER OF EXPOSURE 1 AND EXPOSURE 3. DAMAGE STONE AT FOUNDATION CORNER OF 1 AND 2 AND DAMAGED JOINTS. REMEDY: MAINTAIN BUILDING REPAIR AND/OR REPLACE

  • 10 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 5, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1035353. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 20 alteration filing. Its latest status categories are 17 approved, 1 under review, 2 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Sep 14, 2020
Latest recorded change
Oct 30, 2026
Highest proposed story count
18 stories
Highest proposed unit count
Not stated

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 511 5 Avenue.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 20 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Modification to an existing sprinkler system in conjunction with OT # 140951496. Filing M00395386-I1.

    01
  2. Alteration approved

    Filing M00395386-I1 reached an approved status.

    02
  3. Alteration filed

    General construction work to include interior demolition as shown on plans. no changes to use, egress or occupancy. Filing M00557621-I1.

    03
  4. Alteration approved

    Filing M00557621-I1 reached an approved status.

    04
  5. Permit recorded for alteration

    DOB lists a first permit date for M00557621-I1. That is not by itself confirmation of activity on site.

    05
  6. Permit recorded for alteration

    DOB lists a first permit date for M00395386-I1. That is not by itself confirmation of activity on site.

    06
  7. Alteration filed

    Install new fixtures: (1) FD on the 1st; (1) Lavatory, (1) WC, (1) sink on the Mez and (1) sink, (2) lavatories, (2) WCs, (1) DF, (1) HWH and (1) circulation pump on the 2nd Floor and associated CW/sanitary piping as per plans (North Face Retail Flagship. Filing M01206803-I1.

    07
  8. Alteration filed

    Modifications to the existing Sprinkler System: Install (26) new sprinkler heads on 1st Floor, (61) heads on the Mezzanine Level, (59) heads on the 2nd Floor and associated sprinkler piping as per plans (North Face Retail Flagship.). Filing M01206819-I1.

    08
  9. Alteration approved

    Filing M01206803-I1 reached an approved status.

    09
  10. Alteration approved

    Filing M01206819-I1 reached an approved status.

    010
  11. Permit recorded for alteration

    DOB lists a first permit date for M01206803-I1. That is not by itself confirmation of activity on site.

    011
  12. Permit recorded for alteration

    DOB lists a first permit date for M01206819-I1. That is not by itself confirmation of activity on site.

    012
  13. Alteration filed

    Interior renovation of existing office space on the 10th & 11th floors. Work to include minor demo, new partitions, doors and ceiling modifications as shown on plans. No change in use, egress or occupancy. Filing M01389891-I1.

    013
  14. Alteration filed

    Installation of new plumbing systems as per plans for the 10th & 11th floors. No change in use, egress or occupancy. Filing M01389891-S2.

    014
  15. Alteration approved

    Filing M01389891-S2 reached an approved status.

    015
  16. Alteration approved

    Filing M01389891-I1 reached an approved status.

    016
  17. Alteration filed

    Modifications of existing sprinkler system to include relocation, additions and removals of existing sprinkler heads. No change in use, egress or occupancy. Filing M01389891-S3.

    017
  18. Alteration approved

    Filing M01389891-S3 reached an approved status.

    018
  19. Permit recorded for alteration

    DOB lists a first permit date for M01389891-I1. That is not by itself confirmation of activity on site.

    019
  20. Permit recorded for alteration

    DOB lists a first permit date for M01389891-S2. That is not by itself confirmation of activity on site.

    020
  21. Permit recorded for alteration

    DOB lists a first permit date for M01389891-S3. That is not by itself confirmation of activity on site.

    021
  22. Alteration now approved

    The latest status recorded for M01389891-S3 is “Permit Entire.”

    022
  23. Alteration filed

    Modifications to existing SP system and related piping for new office tenant space. No change in use, egress or occupancy. Filing M01425228-S3.

    023
  24. Alteration filed

    Modifications to existing plumbing system and related piping for new office tenant space. No change in use, egress or occupancy. Filing M01425228-S2.

    024
  25. Alteration filed

    Modifications to existing HVAC system and related piping for new office tenant space. No change in use, egress or occupancy. Filing M01425228-S1.

    025
  26. Alteration filed

    Interior renovation of existing office space located on the 15th floor. Work to include minor demo, new partitions, doors and ceiling modifications as shown on plans. No change in use, egress or occupancy. Filing M01425228-I1.

    026
  27. Alteration approved

    Filing M01425228-I1 reached an approved status.

    027
  28. Alteration now approved

    The latest status recorded for M00557621-I1 is “Permit Entire.”

    028
  29. Alteration signed off

    DOB recorded a sign-off for M01206819-I1.

    029
  30. Alteration now completed

    The latest status recorded for M01206819-I1 is “LOC Issued.”

    030
  31. Alteration approved

    Filing M01425228-S1 reached an approved status.

    031
  32. Alteration approved

    Filing M01425228-S2 reached an approved status.

    032
  33. Alteration approved

    Filing M01425228-S3 reached an approved status.

    033
  34. Alteration signed off

    DOB recorded a sign-off for M01206803-I1.

    034
  35. Alteration now completed

    The latest status recorded for M01206803-I1 is “LOC Issued.”

    035
  36. Permit recorded for alteration

    DOB lists a first permit date for M01425228-S2. That is not by itself confirmation of activity on site.

    036
  37. Alteration now approved

    The latest status recorded for M01425228-S2 is “Permit Entire.”

    037
  38. Permit recorded for alteration

    DOB lists a first permit date for M01425228-S1. That is not by itself confirmation of activity on site.

    038
  39. Alteration now approved

    The latest status recorded for M01425228-S1 is “Permit Entire.”

    039
  40. Permit recorded for alteration

    DOB lists a first permit date for M01425228-I1. That is not by itself confirmation of activity on site.

    040
  41. Alteration now approved

    The latest status recorded for M01425228-I1 is “Permit Entire.”

    041
  42. Alteration filed

    FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola. Filing M01461616-I1.

    042
  43. Permit recorded for alteration

    DOB lists a first permit date for M01425228-S3. That is not by itself confirmation of activity on site.

    043
  44. Alteration now approved

    The latest status recorded for M01425228-S3 is “Permit Entire.”

    044
  45. Alteration filed

    Modification to an existing sprinkler system in conjunction with OT # 140951496. Filing M00395386-P3.

    045
  46. Alteration filed

    Modification to an existing sprinkler system. Filing M00438657-P3.

    046
  47. Alteration now under review

    The latest status recorded for M00438657-P3 is “Pending Plan Examiner Assignment.”

    047
  48. Alteration filed

    General construction to include interior renovation of existing space. No change in use, egress or occupancy. Filing M01457907-I1.

    048
  49. Alteration filed

    Installation of new plumbing systems as per plans for the 10th & 11th floors. No change in use, egress or occupancy. Filing M01389891-P2.

    049
  50. Alteration now approved

    The latest status recorded for M01389891-I1 is “Permit Entire.”

    050
  51. Alteration filed

    Interior renovation of existing office space on the 10th & 11th floors. Work to include minor demo, new partitions, doors and ceiling modifications as shown on plans. No change in use, egress or occupancy. Filing M01389891-P1.

    051
  52. Alteration approved

    Filing M01389891-P1 reached an approved status.

    052
  53. Alteration now approved

    The latest status recorded for M01389891-P1 is “Approved.”

    053
  54. Alteration filed

    Sprinkler work as shown on plans filed herewith. Filing M01457907-S3.

    054
  55. Alteration filed

    Plumbing as shown on plans filed herewith. Filing M01457907-S2.

    055
  56. Alteration approved

    Filing M01457907-I1 reached an approved status.

    056
  57. Alteration approved

    Filing M01389891-P2 reached an approved status.

    057
  58. Alteration now approved

    The latest status recorded for M01389891-P2 is “Approved.”

    058
  59. Alteration now approved

    The latest status recorded for M01389891-S2 is “Permit Entire.”

    059
  60. Alteration filed

    Mechanical work as shown on plans filed herewith. Filing M01457907-S1.

    060
  61. Permit recorded for alteration

    DOB lists a first permit date for M01457907-S1. That is not by itself confirmation of activity on site.

    061
  62. Alteration now approved

    The latest status recorded for M01457907-S1 is “Permit Entire.”

    062
  63. Permit recorded for alteration

    DOB lists a first permit date for M01457907-I1. That is not by itself confirmation of activity on site.

    063
  64. Alteration now approved

    The latest status recorded for M01457907-I1 is “Permit Entire.”

    064
  65. Alteration approved

    Filing M01457907-S3 reached an approved status.

    065
  66. Alteration now approved

    The latest status recorded for M01457907-S3 is “Approved.”

    066
  67. Alteration approved

    Filing M01457907-S2 reached an approved status.

    067
  68. Alteration now approved

    The latest status recorded for M01457907-S2 is “Approved.”

    068
  69. Alteration approved

    Filing M01461616-I1 reached an approved status.

    069
  70. Permit recorded for alteration

    DOB lists a first permit date for M01461616-I1. That is not by itself confirmation of activity on site.

    070
  71. Alteration now approved

    The latest status recorded for M01461616-I1 is “Permit Entire.”

    071
  72. Alteration approved

    Filing M00395386-P3 reached an approved status.

    072
  73. Alteration now approved

    The latest status recorded for M00395386-P3 is “Approved.”

    073
  74. Alteration now approved

    The latest status recorded for M00395386-I1 is “Permit Entire.”

    074