DOB filing M01425228-S3
Alteration filing at 511 5 Avenue
Building record · BIN 1035353
511 5 Avenue, Manhattan, NY 10017
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 9 independently sourced records, including 7 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 1035353
511 5 Avenue
Midtown-Times Square, Manhattan
A consolidated public-record view · updated Sep 23, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 17-story office building built in 1917, on a 7,735 sq ft lot.
Owner of record
511 FIFTH AVENUE LLC
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 26, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
The Department of Buildings has 17 open notices on record for this building, out of 115 notices on file; the most recent was issued Feb 19, 2026.
Issued Feb 19, 2026 — FTM BLDG. OBSERVED ON EXP 2 CRACKS IN LINTEL AT 2ND FLOOR; OPEN MORTAR JOINTS AND CRACK IN WATER TABLE MASONARY. EXP 3; DAMAGED SPALLED STONE ABOVE HEAD HEIGHT TO THE RIGHT OF REAR ENTRANCE. REMEDY: REPAIR AND/OR REPLACE
Issued Sep 23, 2024 — VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
Issued Sep 20, 2024 — EMERGENCY WORK ORDER DUE TO CRACK DETERIORATION OF DECORATIVE STONE @ 2ND FL CORNICE OF EXPOSURE 2 NORTH ELEVATION LOCATION AT EAST & WEST CORNER. REMEDY: IMMEDIATELY INSTALL PUBLIC PROTECTION AT NORTH, EAST & WEST CORNER. MAKE IMMEDIATE REPAIRS UNDER SUPERVISION OF NYC LICENSED PROFESSIONAL
14 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 25, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1035353. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 9 alteration filing. Its latest status categories are 6 approved, 1 under review, 2 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 511 5 Avenue.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 9 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
General construction work to include interior demolition as shown on plans. no changes to use, egress or occupancy. Filing M00557621-I1.
Filing M00557621-I1 reached an approved status.
DOB lists a first permit date for M00557621-I1. That is not by itself confirmation of activity on site.
Install new fixtures: (1) FD on the 1st; (1) Lavatory, (1) WC, (1) sink on the Mez and (1) sink, (2) lavatories, (2) WCs, (1) DF, (1) HWH and (1) circulation pump on the 2nd Floor and associated CW/sanitary piping as per plans (North Face Retail Flagship. Filing M01206803-I1.
Modifications to the existing Sprinkler System: Install (26) new sprinkler heads on 1st Floor, (61) heads on the Mezzanine Level, (59) heads on the 2nd Floor and associated sprinkler piping as per plans (North Face Retail Flagship.). Filing M01206819-I1.
Filing M01206803-I1 reached an approved status.
Filing M01206819-I1 reached an approved status.
DOB lists a first permit date for M01206803-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01206819-I1. That is not by itself confirmation of activity on site.
Modifications of existing sprinkler system to include relocation, additions and removals of existing sprinkler heads. No change in use, egress or occupancy. Filing M01389891-S3.
Filing M01389891-S3 reached an approved status.
DOB lists a first permit date for M01389891-S3. That is not by itself confirmation of activity on site.
The latest status recorded for M01389891-S3 is “Permit Entire.”
Modifications to existing SP system and related piping for new office tenant space. No change in use, egress or occupancy. Filing M01425228-S3.
Modifications to existing plumbing system and related piping for new office tenant space. No change in use, egress or occupancy. Filing M01425228-S2.
Modifications to existing HVAC system and related piping for new office tenant space. No change in use, egress or occupancy. Filing M01425228-S1.
Interior renovation of existing office space located on the 15th floor. Work to include minor demo, new partitions, doors and ceiling modifications as shown on plans. No change in use, egress or occupancy. Filing M01425228-I1.
Filing M01425228-I1 reached an approved status.
The latest status recorded for M00557621-I1 is “Permit Entire.”
DOB recorded a sign-off for M01206819-I1.
The latest status recorded for M01206819-I1 is “LOC Issued.”
Filing M01425228-S1 reached an approved status.
Filing M01425228-S2 reached an approved status.
Filing M01425228-S3 reached an approved status.
DOB recorded a sign-off for M01206803-I1.
The latest status recorded for M01206803-I1 is “LOC Issued.”
DOB lists a first permit date for M01425228-S2. That is not by itself confirmation of activity on site.
The latest status recorded for M01425228-S2 is “Permit Entire.”
DOB lists a first permit date for M01425228-S1. That is not by itself confirmation of activity on site.
The latest status recorded for M01425228-S1 is “Permit Entire.”
DOB lists a first permit date for M01425228-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01425228-I1 is “Permit Entire.”
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola. Filing M01461616-I1.
The latest status recorded for M01461616-I1 is “Pending Plan Examiner Assignment.”
DOB lists a first permit date for M01425228-S3. That is not by itself confirmation of activity on site.
The latest status recorded for M01425228-S3 is “Permit Entire.”