NYC DOB record · M01461616-I1

511 5 Avenue

511 5 Avenue, Manhattan, NY 10017

Alteration filing in Midtown-Times Square, Manhattan. The latest DOB status is pending plan examiner assignment.

The filing is waiting for DOB to assign an examiner. Review has not started. What every status means

Under reviewAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 24, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01461616-I1

511 5 Avenue

Manhattan, NY 10017

Alteration filing · status dated Sep 22, 2026

Current record
Under review
Proposed scale
Not stated
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01461616-I1 as a alteration filing at 511 5 Avenue, Manhattan, NY 10017. Its latest published status category is Under review, dated Sep 22, 2026. The published record does not state proposed stories or dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Under review
Latest status date
Sep 22, 2026
Proposed scale
Not stated in this filing
The building, not the filingopen housing violations, the owner of record and every filing at BIN 1035353Applicant of recordSee the 18 filings that name Structual Presv System
FiledSep 21, 2026
Current recordUnder review
Proposed scaleNot specified
Recorded costNot published

What the filing says

A public-record reading of the proposed work.

FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 17-story office building built in 1917, on a 7,735 sq ft lot.

Built
1917
Last altered
1983
Floors
17
Residential units
0
Building type
Office building
Land use
Commercial and office
Zoning district
C5-3
Lot area
7,735 sq ft
Building area
125,632 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 26, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 17 open notices on record for this building, out of 115 notices on file; the most recent was issued Feb 19, 2026.

  • Construction

    Issued Feb 19, 2026 — FTM BLDG. OBSERVED ON EXP 2 CRACKS IN LINTEL AT 2ND FLOOR; OPEN MORTAR JOINTS AND CRACK IN WATER TABLE MASONARY. EXP 3; DAMAGED SPALLED STONE ABOVE HEAD HEIGHT TO THE RIGHT OF REAR ENTRANCE. REMEDY: REPAIR AND/OR REPLACE

  • Low pressure boiler

    Issued Sep 23, 2024 — VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION

  • Construction

    Issued Sep 20, 2024 — EMERGENCY WORK ORDER DUE TO CRACK DETERIORATION OF DECORATIVE STONE @ 2ND FL CORNICE OF EXPOSURE 2 NORTH ELEVATION LOCATION AT EAST & WEST CORNER. REMEDY: IMMEDIATELY INSTALL PUBLIC PROTECTION AT NORTH, EAST & WEST CORNER. MAKE IMMEDIATE REPAIRS UNDER SUPERVISION OF NYC LICENSED PROFESSIONAL

  • 14 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 25, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01461616-I1.

    01
  2. Current status updated

    The latest recorded filing status is “Pending Plan Examiner Assignment.”

    02

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 71,086 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01461616-I1
BBL
1012770069
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
Empty in the source
Proposed dwelling units
Empty in the source