NYC DOB record · M00704461-P4

1050 5 Avenue

1050 5 Avenue, Manhattan, NY 10028

Alteration filing in Upper East Side-Carnegie Hill, Manhattan. The latest DOB status is plan examiner review.

A DOB plan examiner is reviewing the application. Nothing has been approved yet. What every status means

Under reviewAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 6, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M00704461-P4

1050 5 Avenue

Manhattan, NY 10028

Alteration filing · status dated Oct 1, 2026

Current record
Under review
Proposed scale
20 stories
Dwelling units
90
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M00704461-P4 as a alteration filing at 1050 5 Avenue, Manhattan, NY 10028. Its latest published status category is Under review, dated Oct 1, 2026. The filing records 20 proposed stories and 90 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Under review
Latest status date
Oct 1, 2026
Proposed scale
20 proposed stories and 90 proposed dwelling units
The building, not the filingopen housing violations, what it sold for, apartment sizes and every filing at BIN 1046845Applicant of recordSee the 191 filings that name Ces Engineering LLC
FiledSep 30, 2026
Current recordUnder review
Proposed scale20 stories
Recorded cost$42,000

What the filing says

A public-record reading of the proposed work.

Plumbing work associated with the duplex apartment renovation as shown on plans filed herewith. no change to use, egress, or occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 20-story elevator apartment building built in 1958, with 90 homes, on a 14,475 sq ft lot.

Built
1958
Floors
20
Residential units
90
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R10
Lot area
14,475 sq ft
Building area
190,640 sq ft
Historic district
Expanded Carnegie Hill Historic District

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 20, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 2 open notices on record for this building, out of 42 notices on file; the most recent was issued Dec 1, 2022.

  • Failure to post energy

    Issued Dec 1, 2022 — FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3

  • Elevator

    Issued Sep 10, 2008

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 17, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M00704461-P4.

    01
  2. Current status updated

    The latest recorded filing status is “Plan Examiner Review.”

    02

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 84,915 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M00704461-P4
BBL
1014980001
Review type
Standard Plan Examination
Existing stories
20
Proposed stories
20
Existing dwelling units
90
Proposed dwelling units
90