What the filing says
A public-record reading of the proposed work.
Filing herewith plans showing interior renovation work inside Apt 18BC, on the 17th floor as per plans submitted. No change in use, Egress or Occupancy under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 20-story elevator apartment building built in 1958, with 90 homes, on a 14,475 sq ft lot.
- Built
- 1958
- Floors
- 20
- Residential units
- 90
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R10
- Lot area
- 14,475 sq ft
- Building area
- 190,640 sq ft
- Historic district
- Expanded Carnegie Hill Historic District
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 22, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 42 notices on file; the most recent was issued Dec 1, 2022.
- Failure to post energy
Issued Dec 1, 2022 — FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
- Elevator
Issued Sep 10, 2008
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 22, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01027276-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded05
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,798 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01027276-I1
- BBL
- 1014980001
- Postal code
- 10028 · 302 filings
- Review type
- Standard Plan Examination
- Existing stories
- 20
- Proposed stories
- 20
- Existing dwelling units
- 91
- Proposed dwelling units
- 91