DOB filing M01369847-I1
Alteration filing at 424 Madison Avenue
Building record · BIN 1035445
424 Madison Avenue, Manhattan, NY 10017
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 7 independently sourced records, including 2 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 1035445
424 Madison Avenue
Midtown-Times Square, Manhattan
A consolidated public-record view · updated Oct 5, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 15-story office building built in 1926, on a 4,375 sq ft lot.
Owner of record
COMM 2014-UBS4 FIFTH AVENUE, LLC
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 7, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
The Department of Buildings has 2 open notices on record for this building, out of 34 notices on file; the most recent was issued Sep 3, 2019.
Issued Sep 3, 2019 — FAILED TO FILE FINAL SPRINKLER REPORT BY JULY 1, 2019
Issued Jan 2, 2011
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 7, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1035445. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 7 alteration filing. Its latest status categories are 2 approved, 5 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 424 Madison Avenue.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 7 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Modification of sprinkler system to remove, relocate, and replace sprinkler heads as shown on the drawings filed herewith. No change in use, egress, or occupancy. Filing M00809103-I1.
Filing M00809103-I1 reached an approved status.
DOB lists a first permit date for M00809103-I1. That is not by itself confirmation of activity on site.
FILING MS FOR 2nd FLOOR INTERIOR RENOVATION, NEW OFFICES, PANTRY, CONFERENCE ROOM, & BATHROOMS AS PER PLAN. 2. NEW FINISHES, CEILING, LIGHTING, AC UNITS, SPRINKLER HEADS. Filing M01244111-I1.
FILING PL/SP FOR 2nd FLOOR INTERIOR RENOVATION, NEW OFFICES, PANTRY, CONFERENCE ROOM, & BATHROOMS AS PER PLAN. 2. NEW FINISHES, CEILING, LIGHTING, AC UNITS, SPRINKLER HEADS. Filing M01244112-I1.
Filing M01244112-I1 reached an approved status.
Filing M01244111-I1 reached an approved status.
DOB lists a first permit date for M01244112-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01244111-I1. That is not by itself confirmation of activity on site.
FILING PL/SP FOR 8th FLOOR INTERIOR RENOVATION, NEW OFFICES, PANTRY, CONFERENCE ROOM, & BATHROOMS AS PER PLAN. SPRINKLER HEADS AS PER PLAN. Filing M01355065-S2.
Filing ms for 8th floor interior renovation - construct new offices, pantry as per plan. Filing M01355065-S1.
Filing M01355065-S2 reached an approved status.
Filing M01355065-S1 reached an approved status.
DOB lists a first permit date for M01355065-S2. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01355065-S1. That is not by itself confirmation of activity on site.
PL/SP for INSTALLATION OF NEW SUPPLY WATER AND SANITARY DRAIN PIPING AT 4TH FLOOR, TO BE CONNECTED AT THE 3RD FLOOR CEILING. INSTALLATION OF TWENTY-TWO (22) SPRINKLER HEADS AS SHOWN ON PLAN AT FOURTH FLOOR. NO CHANGE IN EGRESS OR USE OF OCCUPANCY. Filing M01389310-S2.
Filing M01389310-S2 reached an approved status.
GC filing for Interior demolition and construction per plans; new finishes including carpet and paint throughout; replacement of all light fixtures and HVAC units; full bathroom renovations and new pantry. No change to use, egress, or occupancy. Filing M01369847-I1.
Filing M01369847-I1 reached an approved status.
DOB lists a first permit date for M01389310-S2. That is not by itself confirmation of activity on site.
DOB recorded a sign-off for M01355065-S1.
The latest status recorded for M01355065-S1 is “LOC Issued.”
The latest status recorded for M01389310-S2 is “Permit Entire.”
DOB recorded a sign-off for M01355065-S2.
The latest status recorded for M01355065-S2 is “LOC Issued.”
DOB recorded a sign-off for M01244112-I1.
The latest status recorded for M01244112-I1 is “LOC Issued.”
DOB recorded a sign-off for M00809103-I1.
The latest status recorded for M00809103-I1 is “LOC Issued.”
DOB recorded a sign-off for M01244111-I1.
The latest status recorded for M01244111-I1 is “LOC Issued.”
DOB lists a first permit date for M01369847-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01369847-I1 is “Permit Entire.”