What the filing says
A public-record reading of the proposed work.
PL/SP for INSTALLATION OF NEW SUPPLY WATER AND SANITARY DRAIN PIPING AT 4TH FLOOR, TO BE CONNECTED AT THE 3RD FLOOR CEILING. INSTALLATION OF TWENTY-TWO (22) SPRINKLER HEADS AS SHOWN ON PLAN AT FOURTH FLOOR. NO CHANGE IN EGRESS OR USE OF OCCUPANCY.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 15-story office building built in 1926, on a 4,375 sq ft lot.
- Built
- 1926
- Last altered
- 1987
- Floors
- 15
- Residential units
- 0
- Building type
- Office building
- Land use
- Commercial and office
- Zoning district
- C5-3
- Lot area
- 4,375 sq ft
- Building area
- 62,237 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 12, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 34 notices on file; the most recent was issued Sep 3, 2019.
- Sprinkler
Issued Sep 3, 2019 — FAILED TO FILE FINAL SPRINKLER REPORT BY JULY 1, 2019
- Elevator
Issued Jan 2, 2011
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 10, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01389310-S2.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01389310-S2
- BBL
- 1012840056
- Postal code
- 10017 · 380 filings
- Review type
- Professional Certification
- Existing stories
- 15
- Proposed stories
- 15
- Existing dwelling units
- 0
- Proposed dwelling units
- 0








