DOB filing M01387918-I1
Alteration filing at 575 Madison Avenue
Building record · BIN 1035789
575 Madison Avenue, Manhattan, NY 10022
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 4 independently sourced records, including 4 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 1035789
575 Madison Avenue
Midtown-Times Square, Manhattan
A consolidated public-record view · updated Sep 18, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 25-story office building built in 1950, on a 20,075 sq ft lot.
The apartments
714 condominium apartments are assessed on this block, and the typical one is 1,587 sq ft (147 m²). They run from 32 to 1106 m².
The city values the typical one at $830,620. That is the Department of Finance’s market valuation for tax, not an asking price and not a sale.
What it sold for
17 apartments on this tax block changed hands in the year the city last published, at a median of $2,850,000, from 41,126 to 52,500,000.
Recorded sale prices from the Department of Finance’s rolling file, covering the year to Aug 31, 2026. Transfers under $10,000 are left out: New York records deed transfers between relatives at a dollar, and those are not sales. No apartment number and no name is carried from either side.
Owner of record
RXR 590 MADISON OWNER LLC
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 20, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
The Department of Buildings has 11 open notices on record for this building, out of 154 notices on file; the most recent was issued Feb 22, 2024.
Issued Feb 22, 2024 — FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
Issued Sep 3, 2019 — FAILED TO FILE FINAL SPRINKLER REPORT BY JULY 1, 2019
Issued May 20, 2019 — FAILURE TO PERFORM CATEGORY 5 INSPECTION
8 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 20, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1035789. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 4 alteration filing. Its latest status categories are 3 approved, 1 under review. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 575 Madison Avenue.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 4 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Interior alteration within existing tenant space on 10th floor in existing building: new sprinkler head and piping routes per new dental office layout, in conjunction with gc job#m01375537-i1. no change to occupancy, egress or use. Filing M01397777-I1.
INSTALL NEW DUCTWORK AND DIFFUSERS PER NEW LAYOUT. INSTALL NEW VAV BOX AND CONTROL. CONNECT NEW DUCTWORK TO EXISTING BUILDING HVAC SYSTEM. INSTALL NEW EXHAUST FAN AND DUCTWORK. No change to egress, use and occupancy. Filing M01397774-I1.
Filing to reflect minor removal & interior work as well as storefront work as per plans filed. No change to use, egress or occupancy,. Filing M01387918-I1.
Filing M01387918-I1 reached an approved status.
Filing M01397774-I1 reached an approved status.
DOB lists a first permit date for M01397774-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01397774-I1 is “Permit Entire.”
The latest status recorded for M01397777-I1 is “Plan Examiner Review.”
General construction modifications on the 10th floor as per plans filed herewith. no change of use, egress or occupancy. Filing M01347119-I1.
Filing M01347119-I1 reached an approved status.
The latest status recorded for M01347119-I1 is “Approved.”
DOB lists a first permit date for M01387918-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01387918-I1 is “Permit Entire.”