What the filing says
A public-record reading of the proposed work.
INSTALL NEW DUCTWORK AND DIFFUSERS PER NEW LAYOUT. INSTALL NEW VAV BOX AND CONTROL. CONNECT NEW DUCTWORK TO EXISTING BUILDING HVAC SYSTEM. INSTALL NEW EXHAUST FAN AND DUCTWORK. No change to egress, use and occupancy
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 25-story office building built in 1950, on a 20,075 sq ft lot.
- Built
- 1950
- Floors
- 25
- Residential units
- 0
- Building type
- Office building
- Land use
- Commercial and office
- Zoning district
- C5-3
- Lot area
- 20,075 sq ft
- Building area
- 399,613 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 8, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 11 open notices on record for this building, out of 154 notices on file; the most recent was issued Feb 22, 2024.
- No report and / or late filing (facade)
Issued Feb 22, 2024 — FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
- Sprinkler
Issued Sep 3, 2019 — FAILED TO FILE FINAL SPRINKLER REPORT BY JULY 1, 2019
- Non-residential elevator periodic
Issued May 20, 2019 — FAILURE TO PERFORM CATEGORY 5 INSPECTION
8 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 8, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01397774-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 61,761 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01397774-I1
- BIN
- 1035789
- BBL
- 1012920052
- Postal code
- 10022 · 421 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 0
- Proposed dwelling units
- 0