Building record · BIN 1036076

600 Madison Avenue

600 Madison Avenue, Manhattan, NY 10022

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 2 independently sourced records, including 2 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 1036076

600 Madison Avenue

Midtown-Times Square, Manhattan

A consolidated public-record view · updated Sep 24, 2026

DOB filings
2
Active-status
2
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings2
Open or active-status records2
First included filingMay 22, 2026
Latest recorded changeSep 24, 2026

The lot

What is already here?

The lot holds a 25-story office building built in 1965, on a 18,075 sq ft lot.

  1. Floors 2–25Nothing on record
  2. Floor 1Street levelStreet level. The lot is recorded as commercial and office, so this floor is where the commercial space is.
  • Street levelCommercial and office
  • Above the southern skylineFrom about floor 60 — the tallest thing within 60 m to the south is 178.3 m
Drawn from the outline and roof height the Department of City Planning publishes for this building: 95.2 m over 25 floors, as the city counts them. 1 run of floors has something on record. The city publishes a roof height and a storey count for the lot, and nothing at all about any individual floor. What stands to the south is measured from the city’s own footprints and roof heights; it is a statement about the skyline, not a calculation of sunlight.
Built
1965
Floors
25
Residential units
0
Building type
Office building
Land use
Commercial and office
Zoning district
C5-3
Lot area
18,075 sq ft
Building area
315,918 sq ft

What it sold for

3 apartments on this tax block changed hands in the year the city last published, at a median of $2,000,000, from 1,200,000 to 2,500,000.

Recorded sale prices from the Department of Finance’s rolling file, covering the year to Aug 31, 2026. Transfers under $10,000 are left out: New York records deed transfers between relatives at a dollar, and those are not sales. No apartment number and no name is carried from either side.

Owner of record

FULLER MADISON LLC

As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 29, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1036076. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 2 alteration filing. Its latest status categories are 2 approved. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
May 22, 2026
Latest recorded change
Sep 24, 2026
Highest proposed story count
25 stories
Highest proposed unit count
Not stated

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 600 Madison Avenue.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 2 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Replace existing windows with new,thermally broken aluminum windows on the 3rd thru 12th floors as per plans. no change to use, egress or occupancy. Filing M01400244-I1.

    01
  2. Alteration filed

    Existing windows to be replaced with new windows on the 5th through 11th floors as per plans. No change to use, egress, or occupancy. Filing M01400364-I1.

    02
  3. Alteration approved

    Filing M01400364-I1 reached an approved status.

    03
  4. Alteration approved

    Filing M01400244-I1 reached an approved status.

    04
  5. Permit recorded for alteration

    DOB lists a first permit date for M01400244-I1. That is not by itself confirmation of activity on site.

    05
  6. Alteration now approved

    The latest status recorded for M01400244-I1 is “Permit Entire.”

    06
  7. Permit recorded for alteration

    DOB lists a first permit date for M01400364-I1. That is not by itself confirmation of activity on site.

    07
  8. Alteration now approved

    The latest status recorded for M01400364-I1 is “Permit Entire.”

    08