NYC DOB record · M01400244-I1

600 Madison Avenue

600 Madison Avenue, Manhattan, NY 10022

Alteration filing in Midtown-Times Square, Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed.

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 1, 2026 · Verify the source row

Open full map
600 Madison Avenue record graphic showing the DOB filing status and stated proposal scale
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01400244-I1 as a alteration filing at 600 Madison Avenue, Manhattan, NY 10022. Its latest published status category is Approved, dated Aug 24, 2026. The filing records 25 proposed stories.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Aug 24, 2026
Proposed scale
25 proposed stories
Applicant of recordSee the 3 filings that name Socotec INC.
FiledMay 22, 2026
Current recordApproved
Proposed scale25 stories
Recorded cost$1.6M

What the filing says

A public-record reading of the proposed work.

Replace existing windows with new,thermally broken aluminum windows on the 3rd thru 12th floors as per plans. no change to use, egress or occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01400244-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

Scope and identifiers

The details used to match this filing.

DOB filing number
M01400244-I1
BIN
1036076
BBL
1012930059
Review type
Professional Certification
Existing stories
25
Proposed stories
25
Existing dwelling units
0
Proposed dwelling units
0
General construction