Building record · BIN 1036205

245 Park Avenue

245 Park Avenue, Manhattan, NY 10017

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 55 independently sourced records, including 52 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 1036205

245 Park Avenue

East Midtown-Turtle Bay, Manhattan

A consolidated public-record view · updated Oct 30, 2026

DOB filings
55
Active-status
52
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings55
Open or active-status records52
First included filingSep 15, 2023
Latest recorded changeOct 30, 2026

The lot

What is already here?

The lot holds a 45-story office building built in 1966, on a 81,336 sq ft lot.

  1. Floors 2–45Nothing on record
  2. Floor 1Street levelStreet level. The lot is recorded as commercial and office, so this floor is where the commercial space is.
  • Street levelCommercial and office
  • Above the southern skylineFrom about floor 49 — the tallest thing within 60 m to the south is 144.3 m
Drawn from the outline and roof height the Department of City Planning publishes for this building: 186.7 m over 45 floors, as the city counts them. 1 run of floors has something on record. The city publishes a roof height and a storey count for the lot, and nothing at all about any individual floor. What stands to the south is measured from the city’s own footprints and roof heights; it is a statement about the skyline, not a calculation of sunlight.
Built
1966
Last altered
2000
Floors
45
Residential units
0
Building type
Office building
Land use
Commercial and office
Zoning district
C5-3
Lot area
81,336 sq ft
Building area
1,586,876 sq ft

Owner of record

METROPOLITAN TRANSPORTATION AUTHORITY

As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 5, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

Violation record

Are there open violations here?

The Department of Buildings has 4 open notices on record for this building, out of 213 notices on file; the most recent was issued Oct 8, 2026.

  • Construction

    Issued Oct 8, 2026 — STRUCTURE RENDERED NON-COMPLIANT. AT TIME OF INSPECTION OBSERVED AT NORTHEAST CORNER EXPOSURE 2(LEFT) VEHICLE IMPACTED PLAZA WALL MINIMAL DAMAGE.

  • Elevator

    Issued Mar 7, 2016

  • Elevator

    Issued Dec 10, 2007

  • 1 further open notice is on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 5, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1036205. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 55 alteration filing. Its latest status categories are 52 approved, 3 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Sep 15, 2023
Latest recorded change
Oct 30, 2026
Highest proposed story count
46 stories
Highest proposed unit count
Not stated

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 245 Park Avenue.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 55 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Modifications to the existing plumbing system (Gas Meter Room) as per plans. No change to use, egress or occupancy. Filing M00921765-I1.

    01
  2. Alteration approved

    Filing M00921765-I1 reached an approved status.

    02
  3. Alteration filed

    Architectural modifications for elevator pit as per plans. No change to use, egress or occupancy. Filing M01005704-I1.

    03
  4. Alteration approved

    Filing M01005704-I1 reached an approved status.

    04
  5. Permit recorded for alteration

    DOB lists a first permit date for M01005704-I1. That is not by itself confirmation of activity on site.

    05
  6. Alteration filed

    Modifications to the existing sprinkler and standpipe systems (Lobby Renovation) as per plans. No change to use, egress or occupancy. Filing M01007868-I1.

    06
  7. Alteration approved

    Filing M01007868-I1 reached an approved status.

    07
  8. Alteration filed

    Structural modifications (Rooftop Amenity) as per plans. No change to use ,egress or occupancy. Filing M01008037-I1.

    08
  9. Alteration approved

    Filing M01008037-I1 reached an approved status.

    09
  10. Alteration filed

    HVAC modifications for rooftop amenity as per plans. No change to use, egress or occupancy. Filing M01006021-I1.

    010
  11. Alteration filed

    Facade overclad as per plans. No change to use, egress or occupancy. Filing M01006241-I1.

    011
  12. Alteration approved

    Filing M01006021-I1 reached an approved status.

    012
  13. Permit recorded for alteration

    DOB lists a first permit date for M01006021-I1. That is not by itself confirmation of activity on site.

    013
  14. Permit recorded for alteration

    DOB lists a first permit date for M01007868-I1. That is not by itself confirmation of activity on site.

    014
  15. Alteration filed

    Construction fence as per drawings. construction fence shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. Filing M01089051-I1.

    015
  16. Permit recorded for alteration

    DOB lists a first permit date for M01089051-I1. That is not by itself confirmation of activity on site.

    016
  17. Alteration filed

    Heavy duty sidewalk shed during exterior facade work filed under application # m01006241. sidewalk shed shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. Filing M01091095-I1.

    017
  18. Alteration approved

    Filing M01091095-I1 reached an approved status.

    018
  19. Permit recorded for alteration

    DOB lists a first permit date for M01091095-I1. That is not by itself confirmation of activity on site.

    019
  20. Permit recorded for alteration

    DOB lists a first permit date for M00921765-I1. That is not by itself confirmation of activity on site.

    020
  21. Alteration filed

    Temporary pipe scaffold as per drawings. scaffold shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. Filing M01139796-I1.

    021
  22. Permit recorded for alteration

    DOB lists a first permit date for M01139796-I1. That is not by itself confirmation of activity on site.

    022
  23. Alteration approved

    Filing M01006241-I1 reached an approved status.

    023
  24. Alteration filed

    Equipment use: dual 7000 # capacity personnel/material hoists during bldg alteration, filed sep. hoists shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. elevator application submitted separately. Filing M01171548-I1.

    024
  25. Permit recorded for alteration

    DOB lists a first permit date for M01171548-I1. That is not by itself confirmation of activity on site.

    025
  26. Alteration filed

    Temporary hoist run-back structure during bldg alt, filed separately. run-back structure shall comply with chapter #33 of the NYC building code. no change in use, occupancy or egress under this application. hoist & elevator applications filed sep. Filing M01171567-I1.

    026
  27. Permit recorded for alteration

    DOB lists a first permit date for M01171567-I1. That is not by itself confirmation of activity on site.

    027
  28. Alteration filed

    Facade repairs. No change to use, egress or occupancy. Filing M01222300-I1.

    028
  29. Alteration approved

    Filing M01222300-I1 reached an approved status.

    029
  30. Alteration filed

    Storage of material / equipment on top of heavy duty sidewalk shed. storage shall not exceed 150 psf. shed filed under separate application. storage shall comply with ch#33 of the NYC bc. no change in use, occupancy or egress under this application. Filing M01246313-I1.

    030
  31. Permit recorded for alteration

    DOB lists a first permit date for M01246313-I1. That is not by itself confirmation of activity on site.

    031
  32. Permit recorded for alteration

    DOB lists a first permit date for M01006241-I1. That is not by itself confirmation of activity on site.

    032
  33. Alteration filed

    Structural modifications for plaza renovation as per plans. No change to use, egress or occupancy. Filing M01194756-I1.

    033
  34. Alteration approved

    Filing M01194756-I1 reached an approved status.

    034
  35. Permit recorded for alteration

    DOB lists a first permit date for M01194756-I1. That is not by itself confirmation of activity on site.

    035
  36. Alteration filed

    Architectural modifications for plaza renovation as per plans. No change to use, egress or occupancy. Filing M01194738-I1.

    036
  37. Permit recorded for alteration

    DOB lists a first permit date for M01008037-I1. That is not by itself confirmation of activity on site.

    037
  38. Alteration approved

    Filing M01194738-I1 reached an approved status.

    038
  39. Permit recorded for alteration

    DOB lists a first permit date for M01194738-I1. That is not by itself confirmation of activity on site.

    039
  40. Permit recorded for alteration

    DOB lists a first permit date for M01222300-I1. That is not by itself confirmation of activity on site.

    040
  41. Alteration filed

    Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 36th & 40th floors (Ares- Buildout Phase) as per plans. No change to use, egress or occupancy. Filing M01293080-I1.

    041
  42. Alteration filed

    Installation of new plumbing fixtures and associated piping on the 36th & 40th floors (Ares- Buildout Phase) as per plans. No change to use, egress or occupancy. Filing M01293122-I1.

    042
  43. Alteration approved

    Filing M01293080-I1 reached an approved status.

    043
  44. Alteration approved

    Filing M01293122-I1 reached an approved status.

    044
  45. Permit recorded for alteration

    DOB lists a first permit date for M01293080-I1. That is not by itself confirmation of activity on site.

    045
  46. Permit recorded for alteration

    DOB lists a first permit date for M01293122-I1. That is not by itself confirmation of activity on site.

    046
  47. Alteration filed

    Modifications to the existing HVAC system (FSD Additions) on the 27th floor as per plans. No change to use, egress or occupancy. Filing M01349968-I1.

    047
  48. Alteration approved

    Filing M01349968-I1 reached an approved status.

    048
  49. Permit recorded for alteration

    DOB lists a first permit date for M01349968-I1. That is not by itself confirmation of activity on site.

    049
  50. Alteration filed

    Installation of new partitions, doors, ceilings and finishes on the 46th floor (Rooftop Amenity) as per plans. No change to use, egress or occupancy. Filing M01356795-I1.

    050
  51. Alteration filed

    Modifications to the existing HVAC system on the 46th floor (Rooftop Amenity) as per plans. No change to use, egress or occupancy. Filing M01356844-I1.

    051
  52. Alteration approved

    Filing M01356795-I1 reached an approved status.

    052
  53. Alteration approved

    Filing M01356844-I1 reached an approved status.

    053
  54. Permit recorded for alteration

    DOB lists a first permit date for M01356795-I1. That is not by itself confirmation of activity on site.

    054
  55. Permit recorded for alteration

    DOB lists a first permit date for M01356844-I1. That is not by itself confirmation of activity on site.

    055
  56. Alteration filed

    Modifications to the existing sprinkler system on the 1st floor (Property Management Office) as per plans. No change to use, egress or occupancy. Filing M01364665-I1.

    056
  57. Alteration approved

    Filing M01364665-I1 reached an approved status.

    057
  58. Alteration filed

    Modifications to the existing HVAC system on the 1st floor (Property Management Office) as per plans. No change to use, egress or occupancy. Filing M01364524-I1.

    058
  59. Alteration approved

    Filing M01364524-I1 reached an approved status.

    059
  60. Permit recorded for alteration

    DOB lists a first permit date for M01364524-I1. That is not by itself confirmation of activity on site.

    060
  61. Alteration filed

    Installation of new partitions, doors, ceilings and finishes on the 1st floor (Property Management Office) as per plans. No change to use, egress or occupancy. Filing M01364440-I1.

    061
  62. Alteration approved

    Filing M01364440-I1 reached an approved status.

    062
  63. Permit recorded for alteration

    DOB lists a first permit date for M01364665-I1. That is not by itself confirmation of activity on site.

    063
  64. Permit recorded for alteration

    DOB lists a first permit date for M01364440-I1. That is not by itself confirmation of activity on site.

    064
  65. Alteration filed

    Interior renovation of the 32nd Floor (EQT Partners), including interior partitions, doors, ceilings and finishes, as per plans. No change to use, egress, or occupancy. Filing M01360768-I1.

    065
  66. Alteration approved

    Filing M01360768-I1 reached an approved status.

    066
  67. Alteration filed

    Installation of plumbing fixtures and associated piping on the 32nd floor (EQT Partners) as per plans. No change to use, egress or occupancy. Filing M01360896-I1.

    067
  68. Alteration approved

    Filing M01360896-I1 reached an approved status.

    068
  69. Alteration filed

    Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 43rd & 44th floors (Ares- Buildout Phase) as per plans. No change to use, egress or occupancy. Filing M01371003-I1.

    069
  70. Alteration filed

    Installation of a new HVAC system on the 43rd & 44th floors (Ares- Buildout Phase) as per plans. No change to use, egress or occupancy. Filing M01371017-I1.

    070
  71. Alteration approved

    Filing M01371017-I1 reached an approved status.

    071
  72. Alteration approved

    Filing M01371003-I1 reached an approved status.

    072
  73. Permit recorded for alteration

    DOB lists a first permit date for M01360768-I1. That is not by itself confirmation of activity on site.

    073
  74. Permit recorded for alteration

    DOB lists a first permit date for M01360896-I1. That is not by itself confirmation of activity on site.

    074
  75. Alteration filed

    Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 31st, 41st & 42nd floors (Ares- Buildout) as per plans. No change to use, egress or occupancy. Filing M01389256-I1.

    075
  76. Alteration filed

    Installation of a new HVAC system on the 31st floor (Ares- Buildout Phase) as per plans. No change to use, egress or occupancy. Filing M01389301-I1.

    076
  77. Alteration filed

    Structural support for new MEP equipment including slab reinforcement on the 31st floor (Ares- Buildout Phase) as per plans. No change to use, egress or occupancy. Filing M01389363-I1.

    077
  78. Alteration approved

    Filing M01389256-I1 reached an approved status.

    078
  79. Alteration approved

    Filing M01389363-I1 reached an approved status.

    079
  80. Permit recorded for alteration

    DOB lists a first permit date for M01389256-I1. That is not by itself confirmation of activity on site.

    080
  81. Alteration approved

    Filing M01389301-I1 reached an approved status.

    081
  82. Permit recorded for alteration

    DOB lists a first permit date for M01389363-I1. That is not by itself confirmation of activity on site.

    082
  83. Permit recorded for alteration

    DOB lists a first permit date for M01389301-I1. That is not by itself confirmation of activity on site.

    083
  84. Alteration filed

    Installation of a new sprinkler system on the 29th and 30th floors (Day2 TradeWeb) as per plans. No change to use, egress or occupancy. Filing M01418918-I1.

    084
  85. Alteration filed

    Modifications to the existing plumbing system on the 29th and 30th floors (Day2 TradeWeb) as per plans. No change to use, egress or occupancy. Filing M01418910-I1.

    085
  86. Alteration approved

    Filing M01418910-I1 reached an approved status.

    086
  87. Permit recorded for alteration

    DOB lists a first permit date for M01371017-I1. That is not by itself confirmation of activity on site.

    087
  88. Alteration approved

    Filing M01418918-I1 reached an approved status.

    088
  89. Permit recorded for alteration

    DOB lists a first permit date for M01371003-I1. That is not by itself confirmation of activity on site.

    089
  90. Alteration signed off

    DOB recorded a sign-off for M01293122-I1.

    090
  91. Alteration now completed

    The latest status recorded for M01293122-I1 is “LOC Issued.”

    091
  92. Alteration filed

    Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 31st, 41st & 42nd floors (Ares- Buildout) as per plans. No change to use, egress or occupancy. Filing M01389256-P1.

    092
  93. Alteration filed

    Architectural modifications for plaza renovation as per plans. No change to use, egress or occupancy. Filing M01194738-P1.

    093
  94. Alteration approved

    Filing M01389256-P1 reached an approved status.

    094
  95. Alteration now approved

    The latest status recorded for M01389256-P1 is “Approved.”

    095
  96. Alteration filed

    Architectural modifications for elevator pit as per plans. No change to use, egress or occupancy. Filing M01005704-P2.

    096
  97. Alteration now approved

    The latest status recorded for M01089051-I1 is “Permit Entire.”

    097
  98. Alteration now approved

    The latest status recorded for M01171548-I1 is “Permit Entire.”

    098
  99. Alteration now approved

    The latest status recorded for M01246313-I1 is “Permit Entire.”

    099
  100. Alteration now approved

    The latest status recorded for M01171567-I1 is “Permit Entire.”

    0100
  101. Alteration now approved

    The latest status recorded for M01139796-I1 is “Permit Entire.”

    0101
  102. Alteration approved

    Filing M01194738-P1 reached an approved status.

    0102
  103. Alteration now approved

    The latest status recorded for M01194738-P1 is “Approved.”

    0103
  104. Alteration filed

    Minor demolition with installation of new partitions, doors, ceilings and finishes (Demo + Restrooms Renovation) as per plans. No change to use, egress or occupancy. Filing M01455772-I1.

    0104
  105. Alteration filed

    Modifications to the existing HVAC system on the 28th floor (Demo + Restrooms Renovation) as per plans. No change to use, egress or occupancy. Filing M01455798-I1.

    0105
  106. Alteration approved

    Filing M01455798-I1 reached an approved status.

    0106
  107. Alteration filed

    Modifications to the existing plumbing system on the 28th floor (Demo + Restrooms Renovation) as per plans. No change to use, egress or occupancy. Filing M01455811-I1.

    0107
  108. Alteration approved

    Filing M01455811-I1 reached an approved status.

    0108
  109. Alteration now approved

    The latest status recorded for M01008037-I1 is “Permit Entire.”

    0109
  110. Alteration now approved

    The latest status recorded for M01364524-I1 is “Permit Entire.”

    0110
  111. Alteration filed

    Modifications to the existing sprinkler system with installation of a temporary loop on the 28th floor (Demo + Restrooms Renovation) as per plans. No change to use, egress or occupancy. Filing M01455971-I1.

    0111
  112. Alteration approved

    Filing M01455971-I1 reached an approved status.

    0112
  113. Alteration now approved

    The latest status recorded for M01455971-I1 is “Approved.”

    0113
  114. Alteration now approved

    The latest status recorded for M01222300-I1 is “Permit Entire.”

    0114
  115. Alteration now approved

    The latest status recorded for M01364440-I1 is “Permit Entire.”

    0115
  116. Alteration now approved

    The latest status recorded for M01006021-I1 is “Permit Entire.”

    0116
  117. Alteration now approved

    The latest status recorded for M01356844-I1 is “Permit Entire.”

    0117
  118. Alteration now approved

    The latest status recorded for M01194756-I1 is “Permit Entire.”

    0118
  119. Alteration approved

    Filing M01455772-I1 reached an approved status.

    0119
  120. Alteration now approved

    The latest status recorded for M01389256-I1 is “Permit Entire.”

    0120
  121. Alteration now approved

    The latest status recorded for M01356795-I1 is “Permit Entire.”

    0121
  122. Alteration now approved

    The latest status recorded for M01371003-I1 is “Permit Entire.”

    0122
  123. Alteration now approved

    The latest status recorded for M01389301-I1 is “Permit Entire.”

    0123
  124. Alteration now approved

    The latest status recorded for M01389363-I1 is “Permit Entire.”

    0124
  125. Permit recorded for alteration

    DOB lists a first permit date for M01418918-I1. That is not by itself confirmation of activity on site.

    0125
  126. Alteration now approved

    The latest status recorded for M01418918-I1 is “Permit Entire.”

    0126
  127. Permit recorded for alteration

    DOB lists a first permit date for M01418910-I1. That is not by itself confirmation of activity on site.

    0127
  128. Alteration now approved

    The latest status recorded for M01418910-I1 is “Permit Entire.”

    0128
  129. Alteration now approved

    The latest status recorded for M01371017-I1 is “Permit Entire.”

    0129
  130. Alteration now approved

    The latest status recorded for M01194738-I1 is “Permit Entire.”

    0130
  131. Alteration now approved

    The latest status recorded for M01293080-I1 is “Permit Entire.”

    0131
  132. Alteration signed off

    DOB recorded a sign-off for M01349968-I1.

    0132
  133. Alteration now completed

    The latest status recorded for M01349968-I1 is “LOC Issued.”

    0133
  134. Alteration filed

    Heavy duty sidewalk shed during bldg alterations, filed under separate applications . sidewalk shed shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. Filing M01469074-I1.

    0134
  135. Permit recorded for alteration

    DOB lists a first permit date for M01469074-I1. That is not by itself confirmation of activity on site.

    0135
  136. Alteration now approved

    The latest status recorded for M01469074-I1 is “Permit Entire.”

    0136
  137. Alteration filed

    Modifications to the existing plumbing system (Gas Meter Room) as per plans. No change to use, egress or occupancy. Filing M00921765-P4.

    0137
  138. Alteration filed

    Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 38th floor (Ares- Buildout) as per plans. No change to use, egress or occupancy. Filing M01456910-I1.

    0138
  139. Alteration filed

    Installation of new fire hose cabinet on the 38th floors(ARES) as per plans. No change to use, egress or occupancy. Filing M01457020-I1.

    0139
  140. Alteration filed

    Modification to the existing sprinkler system on the 38th floor (Ares- Buildout Phase) as per plans. No change to use, egress or occupancy. Filing M01457012-I1.

    0140
  141. Alteration filed

    Installation of a new HVAC system on the 38th floors (Ares- Buildout Phase) as per plans. No change to use, egress or occupancy. Filing M01456977-I1.

    0141
  142. Alteration approved

    Filing M01456977-I1 reached an approved status.

    0142
  143. Alteration filed

    Installation of new plumbing fixtures and associated piping on the 38th floor (Ares- Buildout Phase) as per plans. No change to use, egress or occupancy. Filing M01457006-I1.

    0143
  144. Alteration approved

    Filing M00921765-P4 reached an approved status.

    0144
  145. Alteration now approved

    The latest status recorded for M00921765-P4 is “Approved.”

    0145
  146. Alteration now approved

    The latest status recorded for M00921765-I1 is “Permit Entire.”

    0146
  147. Alteration approved

    Filing M01457020-I1 reached an approved status.

    0147
  148. Alteration approved

    Filing M01457012-I1 reached an approved status.

    0148
  149. Alteration approved

    Filing M01457006-I1 reached an approved status.

    0149
  150. Alteration now approved

    The latest status recorded for M01457006-I1 is “Approved.”

    0150
  151. Permit recorded for alteration

    DOB lists a first permit date for M01456977-I1. That is not by itself confirmation of activity on site.

    0151
  152. Alteration now approved

    The latest status recorded for M01456977-I1 is “Permit Entire.”

    0152
  153. Alteration approved

    Filing M01456910-I1 reached an approved status.

    0153
  154. Permit recorded for alteration

    DOB lists a first permit date for M01455772-I1. That is not by itself confirmation of activity on site.

    0154
  155. Alteration now approved

    The latest status recorded for M01455772-I1 is “Permit Entire.”

    0155
  156. Permit recorded for alteration

    DOB lists a first permit date for M01455798-I1. That is not by itself confirmation of activity on site.

    0156
  157. Alteration now approved

    The latest status recorded for M01455798-I1 is “Permit Entire.”

    0157
  158. Permit recorded for alteration

    DOB lists a first permit date for M01457020-I1. That is not by itself confirmation of activity on site.

    0158
  159. Alteration now approved

    The latest status recorded for M01457020-I1 is “Permit Entire.”

    0159
  160. Permit recorded for alteration

    DOB lists a first permit date for M01457012-I1. That is not by itself confirmation of activity on site.

    0160
  161. Alteration now approved

    The latest status recorded for M01457012-I1 is “Permit Entire.”

    0161
  162. Permit recorded for alteration

    DOB lists a first permit date for M01455811-I1. That is not by itself confirmation of activity on site.

    0162
  163. Alteration now approved

    The latest status recorded for M01455811-I1 is “Permit Entire.”

    0163
  164. Permit recorded for alteration

    DOB lists a first permit date for M01456910-I1. That is not by itself confirmation of activity on site.

    0164
  165. Alteration now approved

    The latest status recorded for M01456910-I1 is “Permit Entire.”

    0165
  166. Alteration filed

    Modifications to the existing sprinkler system on the 1st floor (NE Retail) as per plans. No change to use, egress or occupancy. Filing M01468224-I1.

    0166
  167. Alteration filed

    Facade overclad as per plans. No change to use, egress or occupancy. Filing M01006241-P1.

    0167
  168. Alteration signed off

    DOB recorded a sign-off for M01091095-I1.

    0168
  169. Alteration now completed

    The latest status recorded for M01091095-I1 is “LOC Issued.”

    0169
  170. Alteration approved

    Filing M01468224-I1 reached an approved status.

    0170
  171. Alteration approved

    Filing M01006241-P1 reached an approved status.

    0171
  172. Alteration now approved

    The latest status recorded for M01006241-P1 is “Approved.”

    0172
  173. Alteration now approved

    The latest status recorded for M01006241-I1 is “Permit Entire.”

    0173
  174. Alteration filed

    Modifications to the existing sprinkler and standpipe systems (Lobby Renovation) as per plans. No change to use, egress or occupancy. Filing M01007868-P3.

    0174
  175. Alteration approved

    Filing M01007868-P3 reached an approved status.

    0175
  176. Alteration now approved

    The latest status recorded for M01007868-P3 is “Approved.”

    0176
  177. Alteration filed

    Interior renovation of the 32nd Floor (EQT Partners), including interior partitions, doors, ceilings and finishes, as per plans. No change to use, egress, or occupancy. Filing M01360768-P2.

    0177
  178. Alteration now approved

    The latest status recorded for M01360896-I1 is “Permit Entire.”

    0178
  179. Alteration filed

    Installation of plumbing fixtures and associated piping on the 32nd floor (EQT Partners) as per plans. No change to use, egress or occupancy. Filing M01360896-P1.

    0179
  180. Alteration approved

    Filing M01360896-P1 reached an approved status.

    0180
  181. Alteration now approved

    The latest status recorded for M01360896-P1 is “Approved.”

    0181
  182. Alteration filed

    Installation of a new sprinkler system on the 16th floor (Houlihan Lokey) as per plans. No change to use, egress or occupancy. Filing M01465880-I1.

    0182
  183. Alteration filed

    Modifications to the existing HVAC system on the 16th floor (Houlihan Lokey) as per plans. No change to use, egress or occupancy. Filing M01465876-I1.

    0183
  184. Alteration approved

    Filing M01360768-P2 reached an approved status.

    0184
  185. Alteration now approved

    The latest status recorded for M01360768-P2 is “Approved.”

    0185
  186. Alteration now approved

    The latest status recorded for M01364665-I1 is “Permit Entire.”

    0186
  187. Alteration filed

    Modifications to the existing sprinkler system on the 1st floor (Property Management Office) as per plans. No change to use, egress or occupancy. Filing M01364665-P1.

    0187
  188. Alteration approved

    Filing M01364665-P1 reached an approved status.

    0188
  189. Alteration now approved

    The latest status recorded for M01364665-P1 is “Approved.”

    0189
  190. Alteration now approved

    The latest status recorded for M01360768-I1 is “Permit Entire.”

    0190
  191. Alteration filed

    Minor demolition with installation of new partitions, doors, ceilings and finishes on the 16th floor (Houlihan Lokey) as per plans. No change to use, egress or occupancy. Filing M01465914-I1.

    0191
  192. Alteration approved

    Filing M01465876-I1 reached an approved status.

    0192
  193. Alteration now approved

    The latest status recorded for M01007868-I1 is “Permit Entire.”

    0193
  194. Alteration approved

    Filing M01005704-P2 reached an approved status.

    0194
  195. Alteration now approved

    The latest status recorded for M01005704-P2 is “Approved.”

    0195
  196. Alteration now approved

    The latest status recorded for M01005704-I1 is “Permit Entire.”

    0196
  197. Alteration approved

    Filing M01465880-I1 reached an approved status.

    0197
  198. Alteration approved

    Filing M01465914-I1 reached an approved status.

    0198
  199. Permit recorded for alteration

    DOB lists a first permit date for M01465876-I1. That is not by itself confirmation of activity on site.

    0199
  200. Alteration now approved

    The latest status recorded for M01465876-I1 is “Permit Entire.”

    0200
  201. Alteration now approved

    The latest status recorded for M01465880-I1 is “Approved.”

    0201
  202. Permit recorded for alteration

    DOB lists a first permit date for M01465914-I1. That is not by itself confirmation of activity on site.

    0202
  203. Alteration now approved

    The latest status recorded for M01465914-I1 is “Permit Entire.”

    0203
  204. Alteration now approved

    The latest status recorded for M01468224-I1 is “Approved.”

    0204