NYC DOB record · M01091095-I1

245 Park Avenue

245 Park Avenue, Manhattan, NY 10017

Alteration filing in East Midtown-Turtle Bay, Manhattan. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 24, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01091095-I1

245 Park Avenue

Manhattan, NY 10017

Alteration filing · status dated Oct 22, 2026

Current record
Recorded as completed
Proposed scale
Not stated
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01091095-I1 as a alteration filing at 245 Park Avenue, Manhattan, NY 10017. Its latest published status category is Recorded as completed, dated Oct 22, 2026. The published record does not state proposed stories or dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Oct 22, 2026
Proposed scale
Not stated in this filing
The building, not the filingopen housing violations, the owner of record and every filing at BIN 1036205Applicant of recordSee the 179 filings that name Brand Access Solutions
FiledAug 5, 2024
Current recordRecorded as completed
Proposed scaleNot specified
Recorded cost$10,000

What the filing says

A public-record reading of the proposed work.

Heavy duty sidewalk shed during exterior facade work filed under application # m01006241. sidewalk shed shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 45-story office building built in 1966, on a 81,336 sq ft lot.

Built
1966
Last altered
2000
Floors
45
Residential units
0
Building type
Office building
Land use
Commercial and office
Zoning district
C5-3
Lot area
81,336 sq ft
Building area
1,586,876 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 24, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 4 open notices on record for this building, out of 213 notices on file; the most recent was issued Oct 8, 2026.

  • Construction

    Issued Oct 8, 2026 — STRUCTURE RENDERED NON-COMPLIANT. AT TIME OF INSPECTION OBSERVED AT NORTHEAST CORNER EXPOSURE 2(LEFT) VEHICLE IMPACTED PLAZA WALL MINIMAL DAMAGE.

  • Elevator

    Issued Mar 7, 2016

  • Elevator

    Issued Dec 10, 2007

  • 1 further open notice is on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 24, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01091095-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 86,497 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01091095-I1
BBL
1013010001
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
0
Proposed dwelling units
0
Sidewalk shed