DOB filing M00805551-P1
Alteration filing at 333 East 46 Street
Building record · BIN 1038901
319 East 46 Street, Manhattan, NY 10017
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 5 independently sourced records, including 3 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 1038901
319 East 46 Street
East Midtown-Turtle Bay, Manhattan
A consolidated public-record view · updated Sep 9, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 20-story elevator apartment building built in 1959, with 176 homes, on a 12,552 sq ft lot.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 12, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
The Department of Buildings has 13 open notices on record for this building, out of 44 notices on file; the most recent was issued Nov 14, 2025.
Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Issued May 16, 2024 — PARTIAL VACATE ORDER.OBSERVED AT EXP1 AND 2,SOUTH AND NORTH ELEV,SPALL ED/CRACKED TERRACES,CONCRETE SLABS AT MULTIPLE LOCATIONS.ALSO OBSERVED BULGED MASONRY BRICKS.THESE CONDITIONS HAVE THEREFORE MADE THE ENTIRE TERRACES AT NORTH AND SOUTH ELEVATIONS UNABLE TO BE OCCUPIED.REMEDY:VA CATE ENTIRE TERRACES AT NORTH AND SOUTH ELEVATIONS
10 further open notices are on file. Open the source dataset for the full list.
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 12, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1038901. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 5 alteration filing. Its latest status categories are 1 under review, 2 approved, 2 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 319 East 46 Street.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 5 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Heating Plant Upgrade - Remove and replace (2) boilers & (2) burners and associated condensate & steam piping. No change to use, egress or occupancy. Filing M00805158-I1.
Filing M00805158-I1 reached an approved status.
DOB lists a first permit date for M00805158-I1. That is not by itself confirmation of activity on site.
Interior renovation of existing apartment unit as per plan submitted herewith, no change in use, egress, or occupancy under this application. Filing M01278708-I1.
Plumbing work filed in conjunction with the apartment renovation, no change in use, egress, or occupancy under this application. Filing M01278708-S1.
Filing M01278708-S1 reached an approved status.
Filing M01278708-I1 reached an approved status.
DOB lists a first permit date for M01278708-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01278708-S1. That is not by itself confirmation of activity on site.
Heating Plant Upgrade - Remove and replace (2) boilers & (2) burners and associated condensate & steam piping. No change to use, egress or occupancy. Filing M00805158-P1.
DOB recorded a sign-off for M01278708-I1.
The latest status recorded for M01278708-I1 is “LOC Issued.”
DOB recorded a sign-off for M01278708-S1.
The latest status recorded for M01278708-S1 is “LOC Issued.”
Filing M00805158-P1 reached an approved status.
The latest status recorded for M00805158-I1 is “Permit Entire.”
The latest status recorded for M00805158-P1 is “Approved.”
Plumbing-related for Heating Plant Upgrade. No change to use, egress or occupancy. Filing M00805551-P1.
The latest status recorded for M00805551-P1 is “Chief Plan Examiner/ Assistant Chief Plan Examiner Review.”