NYC DOB record · M01278708-I1

333 East 46 Street

333 East 46 Street, Manhattan, NY 10017

Alteration filing in East Midtown-Turtle Bay, Manhattan. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Aug 24, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01278708-I1

333 East 46 Street

Manhattan, NY 10017

Alteration filing · status dated Aug 21, 2026

Current record
Recorded as completed
Proposed scale
20 stories
Dwelling units
171
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01278708-I1 as a alteration filing at 333 East 46 Street, Manhattan, NY 10017. Its latest published status category is Recorded as completed, dated Aug 21, 2026. The filing records 20 proposed stories and 171 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Aug 21, 2026
Proposed scale
20 proposed stories and 171 proposed dwelling units
Complete building dossierView all 5 filings associated with BIN 1038901
FiledSep 11, 2025
Current recordRecorded as completed
Proposed scale20 stories
Recorded cost$63,960

What the filing says

A public-record reading of the proposed work.

Interior renovation of existing apartment unit as per plan submitted herewith, no change in use, egress, or occupancy under this application

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 20-story elevator apartment building built in 1959, with 176 homes, on a 12,552 sq ft lot.

Built
1959
Floors
20
Residential units
176
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
C1-9
Lot area
12,552 sq ft
Building area
154,000 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 12, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 13 open notices on record for this building, out of 44 notices on file; the most recent was issued Nov 14, 2025.

  • Low pressure boiler

    Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION

  • Low pressure boiler

    Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION

  • Construction

    Issued May 16, 2024 — PARTIAL VACATE ORDER.OBSERVED AT EXP1 AND 2,SOUTH AND NORTH ELEV,SPALL ED/CRACKED TERRACES,CONCRETE SLABS AT MULTIPLE LOCATIONS.ALSO OBSERVED BULGED MASONRY BRICKS.THESE CONDITIONS HAVE THEREFORE MADE THE ENTIRE TERRACES AT NORTH AND SOUTH ELEVATIONS UNABLE TO BE OCCUPIED.REMEDY:VA CATE ENTIRE TERRACES AT NORTH AND SOUTH ELEVATIONS

  • 10 further open notices are on file. Open the source dataset for the full list.

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 12, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01278708-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01278708-I1
BBL
1013390012
Review type
Standard Plan Examination
Existing stories
20
Proposed stories
20
Existing dwelling units
171
Proposed dwelling units
171
General construction