Alteration filing at 1005 1 Avenue
Building record · BIN 1039972
1005 1 Avenue, Manhattan, NY 10022
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 10 independently sourced records, including 8 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 1039972
1005 1 Avenue
East Midtown-Turtle Bay, Manhattan
A consolidated public-record view · updated Nov 9, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 20-story educational building built in 1907, on a 35,681 sq ft lot.
What it sold for
3 apartments on this tax block changed hands in the year the city last published, at a median of $700,000, from 650,000 to 1,200,000.
Recorded sale prices from the Department of Finance’s rolling file, covering the year to Sep 30, 2026. Transfers under $10,000 are left out: New York records deed transfers between relatives at a dollar, and those are not sales. No apartment number and no name is carried from either side.
Owner of record
X11 FIRST AVE LLC
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 12, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
The Department of Buildings has 11 open notices on record for this building, out of 147 notices on file; the most recent was issued Sep 18, 2026.
Issued Sep 18, 2026 — CONCRETE CYLINDERS WERE NOT PROPERLY CURED IN ACCORDANCE W/BC 1905.6.3 AND ASTM C31. REMEDY:COMPLY WITH CODE. EOR TO REVIEW NON-CONFORMANCE AND PROVIDE S/S ACCEPTANCE STATEMENT BASED ON SUPPLEMENTAL FIELD TEST RESULTS
Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Issued Sep 23, 2024 — VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
8 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 17, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1039972. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 10 alteration filing. Its latest status categories are 1 under review, 7 approved, 2 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 1005 1 Avenue.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 10 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Plumbing work as shown on the plans. Filing M01241994-S2.
Filing M01241994-S2 reached an approved status.
Mechanical work as shown on the plans. Filing M01241994-S1.
Filing M01241994-S1 reached an approved status.
DOB lists a first permit date for M01241994-S1. That is not by itself confirmation of activity on site.
Installation of heavy duty sidewalk shed and construction plywood fence as per plans. temporary equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application. Filing M01250783-I1.
DOB lists a first permit date for M01250783-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01241994-S2. That is not by itself confirmation of activity on site.
Installation of 7,000 lb dual personnel hoist cars @ south as per plans during construction. hoist shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application. Filing M01276327-I1.
Installation of 7,000 lb dual personnel hoist cars @ north as per plans during construction. hoist shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application. Filing M01276322-I1.
DOB lists a first permit date for M01276327-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01276322-I1. That is not by itself confirmation of activity on site.
Installation of pipe scaffolding as per plans. pipe scaffold shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application. Filing M01356009-I1.
DOB lists a first permit date for M01356009-I1. That is not by itself confirmation of activity on site.
DOB recorded a sign-off for M01241994-S2.
The latest status recorded for M01241994-S2 is “LOC Issued.”
DOB recorded a sign-off for M01241994-S1.
The latest status recorded for M01241994-S1 is “LOC Issued.”
Installation of pipe scaffolding as per plans. pipe scaffold shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application. Filing M01356009-P4.
The latest status recorded for M01276327-I1 is “Permit Entire.”
The latest status recorded for M01276322-I1 is “Permit Entire.”
Filing M01356009-P4 reached an approved status.
The latest status recorded for M01356009-P4 is “Approved.”
The latest status recorded for M01356009-I1 is “Permit Entire.”
The latest status recorded for M01250783-I1 is “Permit Entire.”
Installation of temporary suspended scaffold equipment. no changes in the means of egress. Filing M01469531-I1.
Filing M01469531-I1 reached an approved status.
DOB lists a first permit date for M01469531-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01469531-I1 is “Permit Entire.”
This application is filed for a temporary use permit for a sales office including model apartments pursuant to section ac 28-111 and buildings bulletin 2010-002. Filing M01481289-I1.
Filing M01481289-I1 reached an approved status.
The latest status recorded for M01481289-I1 is “Approved.”
This application is filed for a temporary use permit for a sales office including model apartments pursuant to section ac 28-111 and buildings bulletin 2010-002. Filing M01481289-P1.
The latest status recorded for M01481289-P1 is “Prof Cert QA Review.”