NYC DOB record · M01276322-I1

1011 First Avenue

1011 First Avenue, Manhattan, NY 10022

Alteration filing in East Midtown-Turtle Bay, Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 2, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01276322-I1

1011 First Avenue

Manhattan, NY 10022

Alteration filing · status dated Sep 29, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01276322-I1 as a alteration filing at 1011 First Avenue, Manhattan, NY 10022. Its latest published status category is Approved, dated Sep 29, 2026. The published record does not state proposed stories or dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Sep 29, 2026
Proposed scale
Not stated in this filing
The building, not the filingopen housing violations, what it sold for, the owner of record and every filing at BIN 1039972Applicant of recordSee the 137 filings that name Black Sheep Engineering Group
FiledSep 30, 2025
Current recordApproved
Proposed scaleNot specified
Recorded cost$20,400

What the filing says

A public-record reading of the proposed work.

Installation of 7,000 lb dual personnel hoist cars @ north as per plans during construction. hoist shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 20-story educational building built in 1907, on a 35,681 sq ft lot.

Built
1907
Last altered
1990
Floors
20
Residential units
0
Building type
Educational building
Land use
Public facilities and institutions
Zoning district
R10
Lot area
35,681 sq ft
Building area
398,214 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 3, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 11 open notices on record for this building, out of 147 notices on file; the most recent was issued Sep 18, 2026.

  • Construction

    Issued Sep 18, 2026 — CONCRETE CYLINDERS WERE NOT PROPERLY CURED IN ACCORDANCE W/BC 1905.6.3 AND ASTM C31. REMEDY:COMPLY WITH CODE. EOR TO REVIEW NON-CONFORMANCE AND PROVIDE S/S ACCEPTANCE STATEMENT BASED ON SUPPLEMENTAL FIELD TEST RESULTS

  • Low pressure boiler

    Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION

  • Low pressure boiler

    Issued Sep 23, 2024 — VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION

  • 8 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 3, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01276322-I1.

    01
  2. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    02
  3. Current status updated

    The latest recorded filing status is “Permit Entire.”

    03

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 74,561 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01276322-I1
BBL
1013480023
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
0
Proposed dwelling units
0