Building record · BIN 1081154

3 East 54 Street

3 East 54 Street, Manhattan, NY 10022

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 14 independently sourced records, including 14 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 1081154

3 East 54 Street

Midtown-Times Square, Manhattan

A consolidated public-record view · updated Nov 10, 2026

DOB filings
14
Active-status
14
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings14
Open or active-status records14
First included filingMay 14, 2024
Latest recorded changeNov 10, 2026

The lot

What is already here?

The lot holds a 19-story office building built in 1955, on a 18,409 sq ft lot.

  1. Floors 2–19Nothing on record
  2. Floor 1Street levelStreet level. The lot is recorded as commercial and office, so this floor is where the commercial space is.
  • Street levelCommercial and office
  • Above the southern skylineFrom about floor 59 — the tallest thing within 60 m to the south is 174.8 m
Drawn from the outline and roof height the Department of City Planning publishes for this building: 63.6 m over 19 floors, as the city counts them. 1 run of floors has something on record. The city publishes a roof height and a storey count for the lot, and nothing at all about any individual floor. What stands to the south is measured from the city’s own footprints and roof heights; it is a statement about the skyline, not a calculation of sunlight.
Built
1955
Last altered
2025
Floors
19
Residential units
0
Building type
Office building
Land use
Commercial and office
Zoning district
C5-2.5
Lot area
18,409 sq ft
Building area
283,465 sq ft

The apartments

148 condominium apartments are assessed on this block, and the typical one is 1,074 sq ft (100 m²). They run from 41 to 274 m².

The city values the typical one at $431,166. That is the Department of Finance’s market valuation for tax, not an asking price and not a sale.

What it sold for

5 apartments on this tax block changed hands in the year the city last published, at a median of $140,000, from 45,000 to 999,900.

The property itself last changed hands for $141,000,000 on Jan 7, 2026.

Recorded sale prices from the Department of Finance’s rolling file, covering the year to Sep 30, 2026. Transfers under $10,000 are left out: New York records deed transfers between relatives at a dollar, and those are not sales. No apartment number and no name is carried from either side.

Owner of record

E PLUS E LLC

As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 13, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

Violation record

Are there open violations here?

The Department of Buildings has 18 open notices on record for this building, out of 109 notices on file; the most recent was issued Mar 7, 2026.

  • Construction

    Issued Mar 7, 2026 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTE AT TIME OF INSPECTION,OBSERVED BROKEN GLASS AT EXPOSURE 1 SOUTH ELEVATION,CRACKIN G/OPENING MORTAR JOINTS AT EXPOSURE 4 EAST ELEVATION MULTI-LOCATIONS.R EMEDY:OWNER TO REPAIR OR REPLACE

  • Construction

    Issued Jan 5, 2026 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. OBSERVED AT EXPOSURE 1 SOUTH ELEVATION CRACK/BROKEN GLASS PANE, CRACK AND OPEN JOINT AT SOUTH EAST CORNER. EXPOSURE 4 CRACK JOINT/OPEN JOINT AT SOUTH EAST SET BACK LINE. REMEDY: REPAIR AND/OR REPLACE

  • Construction

    Issued Dec 18, 2025 — FTM BLDG IN A CODE COMPLIANT MANNER AS NOTED: @ THE TIME OF INSPECTION I OBSERVED ON EXP 1 S.ELEV: DISLODGED STONE; DAMAGED, MISSING MORTAR JOINTS @ MULTI LOC. EXP 4 EAST, DAMAGE MORTAR JOINTS, SHIFT OUT OF PLACE STONE. REMEDY: REPAIR AND REPLACE DAAMGED FACADE

  • 15 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 15, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1081154. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 11 alteration filing, 3 full demolition. Its latest status categories are 14 approved. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
May 14, 2024
Latest recorded change
Nov 10, 2026
Highest proposed story count
19 stories
Highest proposed unit count
Not stated

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 3 East 54 Street.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 14 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Demolition filed

    Full demolition of 19 story building using hand held and mechanical means to assist within, and machines on grade to assist from exterior. Filing M01004546-I1.

    01
  2. Alteration filed

    Installation of temporary sidewalk shed as per plan. there is no change in use, egress, or occupancy. Filing M01396092-I1.

    02
  3. Alteration filed

    Installation of temporary plywood fence as per plan. no change in use,egress, or occupancy. Filing M01396092-S1.

    03
  4. Permit recorded for alteration

    DOB lists a first permit date for M01396092-S1. That is not by itself confirmation of activity on site.

    04
  5. Alteration filed

    Installation of temporary roof protection as per plan. no change in use, egress, or occupancy. Filing M01396092-S2.

    05
  6. Permit recorded for alteration

    DOB lists a first permit date for M01396092-S2. That is not by itself confirmation of activity on site.

    06
  7. Permit recorded for alteration

    DOB lists a first permit date for M01396092-I1. That is not by itself confirmation of activity on site.

    07
  8. Alteration filed

    Installation of temporary pipe scaffold as per plan. no change in use, egress or occupancy. Filing M01396092-S3.

    08
  9. Permit recorded for alteration

    DOB lists a first permit date for M01396092-S3. That is not by itself confirmation of activity on site.

    09
  10. Alteration filed

    Equipment use: single 7000 # capacity personnel hoist during bldg demolition, filed sep. hoist shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this app. elevator app submitted separately. Filing M01417026-I1.

    010
  11. Permit recorded for alteration

    DOB lists a first permit date for M01417026-I1. That is not by itself confirmation of activity on site.

    011
  12. Demolition filed

    Debris chute will be built onto elevator shaft to lower demolition debris, in accordance with approved demolition plans. EES will be installed to protect site. Filing M01004546-S2.

    012
  13. Demolition filed

    Use of mechanical means to assist with full demolition, in accordance with approved demolition plans. Filing M01004546-S1.

    013
  14. Demolition approved

    Filing M01004546-S2 reached an approved status.

    014
  15. Demolition approved

    Filing M01004546-S1 reached an approved status.

    015
  16. Alteration filed

    Installation of temporary roof protection as per plan. no change in use, egress, or occupancy. Filing M01396092-P2.

    016
  17. Alteration filed

    Installation of temporary pipe scaffold as per plan. no change in use, egress or occupancy. Filing M01396092-P3.

    017
  18. Alteration now approved

    The latest status recorded for M01396092-S3 is “Permit Entire.”

    018
  19. Alteration approved

    Filing M01396092-P3 reached an approved status.

    019
  20. Alteration now approved

    The latest status recorded for M01396092-P3 is “Approved.”

    020
  21. Alteration approved

    Filing M01396092-P2 reached an approved status.

    021
  22. Alteration now approved

    The latest status recorded for M01396092-P2 is “Approved.”

    022
  23. Permit recorded for demolition

    DOB lists a first permit date for M01004546-S2. That is not by itself confirmation of activity on site.

    023
  24. Permit recorded for demolition

    DOB lists a first permit date for M01004546-S1. That is not by itself confirmation of activity on site.

    024
  25. Alteration filed

    Equipment use: single 7000 # capacity personnel hoist during bldg demolition, filed sep. hoist shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this app. elevator app submitted separately. Filing M01417026-P1.

    025
  26. Alteration approved

    Filing M01417026-P1 reached an approved status.

    026
  27. Alteration now approved

    The latest status recorded for M01417026-P1 is “Approved.”

    027
  28. Alteration now approved

    The latest status recorded for M01417026-I1 is “Permit Entire.”

    028
  29. Alteration filed

    Installation of temporary roof protection as per plan. no change in use, egress, or occupancy. Filing M01396092-P4.

    029
  30. Alteration approved

    Filing M01396092-P4 reached an approved status.

    030
  31. Alteration now approved

    The latest status recorded for M01396092-P4 is “Approved.”

    031
  32. Alteration now approved

    The latest status recorded for M01396092-S2 is “Permit Entire.”

    032
  33. Demolition now approved

    The latest status recorded for M01004546-S2 is “Permit Entire.”

    033
  34. Demolition now approved

    The latest status recorded for M01004546-S1 is “Permit Entire.”

    034
  35. Demolition approved

    Filing M01004546-I1 reached an approved status.

    035
  36. Demolition now approved

    The latest status recorded for M01004546-I1 is “Approved.”

    036
  37. Alteration now approved

    The latest status recorded for M01396092-I1 is “Permit Entire.”

    037
  38. Alteration filed

    Installation of temporary sidewalk shed as per plan. there is no change in use, egress, or occupancy. Filing M01396092-P5.

    038
  39. Alteration approved

    Filing M01396092-P5 reached an approved status.

    039
  40. Alteration now approved

    The latest status recorded for M01396092-P5 is “Approved.”

    040
  41. Alteration now approved

    The latest status recorded for M01396092-S1 is “Permit Entire.”

    041
  42. Alteration filed

    Installation of temporary plywood fence as per plan. no change in use,egress, or occupancy. Filing M01396092-P6.

    042
  43. Alteration approved

    Filing M01396092-P6 reached an approved status.

    043
  44. Alteration now approved

    The latest status recorded for M01396092-P6 is “Approved.”

    044