NYC DOB record · M01004546-S1

3 East 54 Street

3 East 54 Street, Manhattan, NY 10022

Full demolition filing in Midtown-Times Square, Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed.

ApprovedFull demolition

NYC Department of Buildings · w9ak-ipjd · accessed Sep 2, 2026 · Verify the source row

Open full map
3 East 54 Street record graphic showing the DOB filing status and stated proposal scale
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01004546-S1 as a full demolition at 3 East 54 Street, Manhattan, NY 10022. Its latest published status category is Approved, dated Aug 31, 2026. The published record does not state proposed stories or dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Full demolition
Latest status
Approved
Latest status date
Aug 31, 2026
Proposed scale
Not stated in this filing
Complete building dossierView all 7 filings associated with BIN 1081154Applicant of recordSee the 18 filings that name Ancora Engineering, PLLC
FiledJul 17, 2026
Current recordApproved
Proposed scaleNot specified
Recorded cost$15,000

What the filing says

A public-record reading of the proposed work.

Use of mechanical means to assist with full demolition, in accordance with approved demolition plans

Street Futures classifies this record as a full demolition based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 19-story office building built in 1955, on a 18,409 sq ft lot.

Built
1955
Last altered
2025
Floors
19
Residential units
0
Building type
Office building
Land use
Commercial and office
Zoning district
C5-2.5
Lot area
18,409 sq ft
Building area
283,465 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 2, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 18 open notices on record for this building, out of 109 notices on file; the most recent was issued Mar 7, 2026.

  • Construction

    Issued Mar 7, 2026 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTE AT TIME OF INSPECTION,OBSERVED BROKEN GLASS AT EXPOSURE 1 SOUTH ELEVATION,CRACKIN G/OPENING MORTAR JOINTS AT EXPOSURE 4 EAST ELEVATION MULTI-LOCATIONS.R EMEDY:OWNER TO REPAIR OR REPLACE

  • Construction

    Issued Jan 5, 2026 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. OBSERVED AT EXPOSURE 1 SOUTH ELEVATION CRACK/BROKEN GLASS PANE, CRACK AND OPEN JOINT AT SOUTH EAST CORNER. EXPOSURE 4 CRACK JOINT/OPEN JOINT AT SOUTH EAST SET BACK LINE. REMEDY: REPAIR AND/OR REPLACE

  • Construction

    Issued Dec 18, 2025 — FTM BLDG IN A CODE COMPLIANT MANNER AS NOTED: @ THE TIME OF INSPECTION I OBSERVED ON EXP 1 S.ELEV: DISLODGED STONE; DAMAGED, MISSING MORTAR JOINTS @ MULTI LOC. EXP 4 EAST, DAMAGE MORTAR JOINTS, SHIFT OUT OF PLACE STONE. REMEDY: REPAIR AND REPLACE DAAMGED FACADE

  • 15 further open notices are on file. Open the source dataset for the full list.

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 2, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01004546-S1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01004546-S1
BBL
1012900006
Review type
Professional Certification
Existing stories
19
Proposed stories
Empty in the source
Existing dwelling units
0
Proposed dwelling units
Empty in the source