DOB filing M01248737-I1
Alteration filing at 867 7 Avenue
Building record · BIN 1083723
867 7 Avenue, Manhattan, NY 10019
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 4 independently sourced records, including 4 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 1083723
867 7 Avenue
Midtown-Times Square, Manhattan
A consolidated public-record view · updated Aug 28, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 26-story hotel built in 1911, on a 22,240 sq ft lot.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 4, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
The Department of Buildings has 10 open notices on record for this building, out of 124 notices on file; the most recent was issued Nov 14, 2025.
Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
7 further open notices are on file. Open the source dataset for the full list.
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1083723. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 1 alteration filing, 3 new building. Its latest status categories are 3 approved, 1 under review. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 867 7 Avenue.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 4 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Per HUB CONSULTATION, proposed construction for New Building high-rise Residential / hotel as per plans filed herewith. Filing M00847788-I1.
Per HUB CONSULTATION, proposed Foundation and Earth work construction for as-of-right New Building high-rise hotel as per plans filed herewith. Filing M00847788-S1.
Filing M00847788-S1 reached an approved status.
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application. Filing M01248737-I1.
DOB lists a first permit date for M01248737-I1. That is not by itself confirmation of activity on site.
Per HUB CONSULTATION, proposed Foundation and Earth work construction for as-of-right New Building high-rise hotel as per plans filed herewith. Filing M00847788-P1.
The latest status recorded for M00847788-S1 is “Approved.”
Filing M00847788-P1 reached an approved status.
The latest status recorded for M00847788-P1 is “Approved.”
The latest status recorded for M00847788-I1 is “Objections.”
The latest status recorded for M01248737-I1 is “Permit Entire.”