What the filing says
A public-record reading of the proposed work.
Per HUB CONSULTATION, proposed Foundation and Earth work construction for as-of-right New Building high-rise hotel as per plans filed herewith.
Street Futures classifies this record as a new building based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 26-story hotel built in 1911, on a 22,240 sq ft lot.
- Built
- 1911
- Floors
- 26
- Residential units
- 0
- Building type
- Hotel
- Land use
- Commercial and office
- Zoning district
- C6-6
- Lot area
- 22,240 sq ft
- Building area
- 207,700 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 2, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 10 open notices on record for this building, out of 124 notices on file; the most recent was issued Nov 14, 2025.
- Low pressure boiler
Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
- Low pressure boiler
Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
- Low pressure boiler
Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
7 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 25, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M00847788-S1.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M00847788-S1
- BBL
- 1010080001
- Postal code
- 10019 · 789 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- 72
- Existing dwelling units
- Empty in the source
- Proposed dwelling units
- 117