Building record · BIN 1086515

462 1 Avenue

462 1 Avenue, Manhattan, NY 10016

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 27 independently sourced records, including 24 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 1086515

462 1 Avenue

Murray Hill-Kips Bay, Manhattan

A consolidated public-record view · updated Nov 10, 2026

DOB filings
27
Active-status
24
Recorded addresses
2
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings27
Open or active-status records24
First included filingDec 2, 2021
Latest recorded changeNov 10, 2026

The lot

What is already here?

The lot holds a 17-story health facility built in 1910, on a 753,175 sq ft lot.

  1. Floors 10–17Above the southern skylineAbove the tallest building within sixty metres to the south, which stands 29 m. Nothing on that side reaches this floor.
  2. Floors 2–9Nothing on record
  3. Floor 1Street levelStreet level. The lot is recorded as public facilities and institutions.
  • Street levelPublic facilities and institutions
  • Above the southern skylineFrom about floor 10 — the tallest thing within 60 m to the south is 29 m
Drawn from the outline and roof height the Department of City Planning publishes for this building: 29 m over 17 floors, as the city counts them. 2 runs of floors have something on record. The city publishes a roof height and a storey count for the lot, and nothing at all about any individual floor. What stands to the south is measured from the city’s own footprints and roof heights; it is a statement about the skyline, not a calculation of sunlight.
Built
1910
Floors
17
Residential units
0
Building type
Health facility
Land use
Public facilities and institutions
Zoning district
R8
Lot area
753,175 sq ft
Building area
2,124,441 sq ft

Housing violations

1 violation is open against this address under the Housing Maintenance Code. 1 of them is the class the city calls immediately hazardous.

  • 1Immediately hazardous
  • 0Hazardous
  • 0Non-hazardous
  • 0Information order

Open means the Department of Housing Preservation and Development has not recorded it as corrected, which is not the same as nobody having fixed it. The city publishes the apartment each was written against; that is not carried here, because a count says a building has a problem and an apartment number says whose.

Owner of record

NATIONAL PASS RR CORP

As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 13, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

Violation record

Are there open violations here?

The Department of Buildings has 16 open notices on record for this building, out of 241 notices on file; the most recent was issued May 8, 2025.

  • Construction

    Issued May 8, 2025 — FAILURE TO MAINTAIN BUILDIING IN A CODE COMPLIANT MANNER. MULTIPLE CRACK BROKEN WINDOWS AT EXP#4 & EXP#1 DAMAGED PREFAB STONE IN MULTIPLE LOCATIONS @ EXP#4 & #1. REMEDY: REPAIR AND/OR REPLACE

  • Failure to correct swarmp conditions (facade)

    Issued May 7, 2025 — CYCLE 9 FAILURE TO CORRECT SWARMP CONDITIONS

  • Construction

    Issued Dec 28, 2024 — EWO DUE DETERIORATION HANGING/LOOSE/SPALLING CONCRETE, CRACKED/BROKEN WINDOW GLASS @ ALL EXP ALSO NOTED CRACKED/SPALLING CONCRETE @ CANOPY @ EXP1 (SOUTH) & EXP3 (NORTH). REMEDY: IMMEDLY TAKE/PROVIDE SAFETY MEASURE TO SECURE & PROTECT THE PUBLIC @ ALL EXP. MAKE IMMED REPAIR UNDER SUPERV OF LP. ALSO REMOVE/SECURE LOOSE AND HANGING MATERIAL

  • 13 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 11, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1086515. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 27 alteration filing. Its latest status categories are 3 under review, 2 closed or withdrawn, 21 approved, 1 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Dec 2, 2021
Latest recorded change
Nov 10, 2026
Highest proposed story count
25 stories
Highest proposed unit count
Not stated

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 462 1 Avenue.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 27 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Modifications for the removal and replacement existing chiller plant on 13th fl. with associated work on the 22nd, 23rd, Roof, Penthouse and Cooling Towers East & West. Filing M00597855-I1.

    01
  2. Alteration filed

    Modification for the removal and replacement existing chiller plant on 13th FL with associated work on the 22nd,23rd,24th floors & Cooling towers east & west. Filing M00595528-I1.

    02
  3. Alteration approved

    Filing M00597855-I1 reached an approved status.

    03
  4. Alteration approved

    Filing M00595528-I1 reached an approved status.

    04
  5. Alteration filed

    Construction fence to support installation of cogen engines. Filing M00673415-I1.

    05
  6. Alteration filed

    Installation of two new cogen engines. Filing M00673316-I1.

    06
  7. Alteration approved

    Filing M00673415-I1 reached an approved status.

    07
  8. Alteration filed

    Constructing CHP platform at Bellevue Hospital. Filing M00686238-I1.

    08
  9. Alteration approved

    Filing M00673316-I1 reached an approved status.

    09
  10. Alteration approved

    Filing M00686238-I1 reached an approved status.

    010
  11. Permit recorded for alteration

    DOB lists a first permit date for M00673316-I1. That is not by itself confirmation of activity on site.

    011
  12. Permit recorded for alteration

    DOB lists a first permit date for M00673415-I1. That is not by itself confirmation of activity on site.

    012
  13. Permit recorded for alteration

    DOB lists a first permit date for M00686238-I1. That is not by itself confirmation of activity on site.

    013
  14. Alteration filed

    Herewith filing for mechanical modifications in the 19th flr forensic unit per plans. no change in use, occupancy, or egress under this application. Filing M08013693-I1.

    014
  15. Alteration filed

    Herewith filing general construction work for 19th floor forensic expansion per plans. no change in use, occupancy or egress under this application. Filing M08013670-I1.

    015
  16. Alteration approved

    Filing M08013693-I1 reached an approved status.

    016
  17. Alteration approved

    Filing M08013670-I1 reached an approved status.

    017
  18. Permit recorded for alteration

    DOB lists a first permit date for M00595528-I1. That is not by itself confirmation of activity on site.

    018
  19. Permit recorded for alteration

    DOB lists a first permit date for M08013693-I1. That is not by itself confirmation of activity on site.

    019
  20. Permit recorded for alteration

    DOB lists a first permit date for M08013670-I1. That is not by itself confirmation of activity on site.

    020
  21. Alteration filed

    Herewith filing for sprinkler modifications at the 16th flr infusion center per plans. no change in use, occupancy, or egress under this application. Filing M00832495-I1.

    021
  22. Alteration approved

    Filing M00832495-I1 reached an approved status.

    022
  23. Alteration filed

    Herewith filing for mechanical modifications in the 13th, 19th & 21st flrs (marketing flrs 12, 18 & 20) in conjunction w/ anti-ligature renovations per plans. no change in use, occupancy, or egress under this application. Filing M08014195-I1.

    023
  24. Alteration filed

    Herewith filing for architectural anti-ligature work on the 13th, 19th and 21st flrs (marketing flrs 12, 18 & 20) per plans. no change in use, occupancy or egress under this application. Filing M08014166-I1.

    024
  25. Alteration filed

    Herewith filing for plumbing modifications to the 13th, 19th and 21st flrs (marketing flrs 12, 18 & 20) in conjunction w/ anti-ligature renovations per plans. Filing M08014199-I1.

    025
  26. Alteration filed

    Herewith filing for sprinkler modifications on the 13th, 19th & 21st flrs (marketing flrs 12, 18 & 20) in conjunction w/ anti-ligature renovations per plans. Filing M08015085-I1.

    026
  27. Alteration approved

    Filing M08015085-I1 reached an approved status.

    027
  28. Alteration approved

    Filing M08014195-I1 reached an approved status.

    028
  29. Alteration approved

    Filing M08014199-I1 reached an approved status.

    029
  30. Alteration approved

    Filing M08014166-I1 reached an approved status.

    030
  31. Alteration filed

    Cooling systems for elevator machine rooms. Filing M01034929-I1.

    031
  32. Alteration approved

    Filing M01034929-I1 reached an approved status.

    032
  33. Permit recorded for alteration

    DOB lists a first permit date for M01034929-I1. That is not by itself confirmation of activity on site.

    033
  34. Permit recorded for alteration

    DOB lists a first permit date for M08015085-I1. That is not by itself confirmation of activity on site.

    034
  35. Permit recorded for alteration

    DOB lists a first permit date for M08014166-I1. That is not by itself confirmation of activity on site.

    035
  36. Permit recorded for alteration

    DOB lists a first permit date for M08014195-I1. That is not by itself confirmation of activity on site.

    036
  37. Permit recorded for alteration

    DOB lists a first permit date for M08014199-I1. That is not by itself confirmation of activity on site.

    037
  38. Permit recorded for alteration

    DOB lists a first permit date for M00832495-I1. That is not by itself confirmation of activity on site.

    038
  39. Alteration filed

    IRA Facade Inspection. Filing M01437025-I1.

    039
  40. Alteration filed

    Herewith filing for mechanical modifications in the 19th flr forensic unit per plans. no change in use, occupancy, or egress under this application. Filing M08013693-P2.

    040
  41. Alteration filed

    Herewith filing for sprinkler modifications and fire hose cabinet relocation on the 19th flr per plans. Filing M08049660-P2.

    041
  42. Alteration approved

    Filing M01437025-I1 reached an approved status.

    042
  43. Permit recorded for alteration

    DOB lists a first permit date for M01437025-I1. That is not by itself confirmation of activity on site.

    043
  44. Alteration filed

    Herewith filing general construction work for 19th floor forensic expansion per plans. no change in use, occupancy or egress under this application. Filing M08013670-P2.

    044
  45. Alteration filed

    Filing for the removal of existing wall mounted FCU, piping and associated controls. Relocate existing wall mounted Fan Coil unit and Install New Heat Pump on Roof. Filing M01339795-I1.

    045
  46. Alteration filed

    Modification for the removal and replacement existing chiller plant on 13th FL with associated work on the 22nd,23rd,24th floors & Cooling towers east & west. Filing M00595528-P1.

    046
  47. Alteration approved

    Filing M01339795-I1 reached an approved status.

    047
  48. Alteration now under review

    The latest status recorded for M08049660-P2 is “Objections.”

    048
  49. Alteration now approved

    The latest status recorded for M08013670-I1 is “Permit Entire.”

    049
  50. Alteration approved

    Filing M08013670-P2 reached an approved status.

    050
  51. Alteration now approved

    The latest status recorded for M08013670-P2 is “Approved.”

    051
  52. Permit recorded for alteration

    DOB lists a first permit date for M01339795-I1. That is not by itself confirmation of activity on site.

    052
  53. Alteration now approved

    The latest status recorded for M01339795-I1 is “Permit Entire.”

    053
  54. Alteration now approved

    The latest status recorded for M00595528-I1 is “Permit Entire.”

    054
  55. Alteration approved

    Filing M00595528-P1 reached an approved status.

    055
  56. Alteration now approved

    The latest status recorded for M00595528-P1 is “Approved.”

    056
  57. Alteration filed

    Herewith filing for architectural anti-ligature work on the 13th, 19th and 21st flrs (marketing flrs 12, 18 & 20) per plans. no change in use, occupancy or egress under this application. Filing M08014166-P2.

    057
  58. Alteration now approved

    The latest status recorded for M00673415-I1 is “Permit Entire.”

    058
  59. Alteration now approved

    The latest status recorded for M00686238-I1 is “Permit Entire.”

    059
  60. Alteration filed

    Herewith filing for plumbing modifications to the 13th, 19th and 21st flrs (marketing flrs 12, 18 & 20) in conjunction w/ anti-ligature renovations per plans. Filing M08014199-P2.

    060
  61. Alteration filed

    Herewith filing for sprinkler modifications on the 13th, 19th & 21st flrs (marketing flrs 12, 18 & 20) in conjunction w/ anti-ligature renovations per plans. Filing M08015085-P2.

    061
  62. Alteration filed

    Herewith filing for mechanical modifications in the 13th, 19th & 21st flrs (marketing flrs 12, 18 & 20) in conjunction w/ anti-ligature renovations per plans. no change in use, occupancy, or egress under this application. Filing M08014195-P2.

    062
  63. Alteration now approved

    The latest status recorded for M00673316-I1 is “Permit Entire.”

    063
  64. Alteration filed

    This application is proposed for the combined heat & power (chp) project comprised of (2) 2 mw natural gas reciprocating engine generators. the associated applications are m00673415, m00686238, m00673316. Filing M01061556-P2.

    064
  65. Alteration now approved

    The latest status recorded for M00832495-I1 is “Permit Entire.”

    065
  66. Alteration approved

    Filing M08014199-P2 reached an approved status.

    066
  67. Alteration now approved

    The latest status recorded for M08014199-P2 is “Approved.”

    067
  68. Alteration approved

    Filing M08015085-P2 reached an approved status.

    068
  69. Alteration now approved

    The latest status recorded for M08015085-P2 is “Approved.”

    069
  70. Alteration approved

    Filing M08014195-P2 reached an approved status.

    070
  71. Alteration now approved

    The latest status recorded for M08014195-P2 is “Approved.”

    071
  72. Alteration now approved

    The latest status recorded for M08014195-I1 is “Permit Entire.”

    072
  73. Alteration now approved

    The latest status recorded for M08014199-I1 is “Permit Entire.”

    073
  74. Alteration approved

    Filing M08014166-P2 reached an approved status.

    074
  75. Alteration now approved

    The latest status recorded for M08014166-P2 is “Approved.”

    075
  76. Alteration now approved

    The latest status recorded for M08014166-I1 is “Permit Entire.”

    076
  77. Alteration approved

    Filing M08013693-P2 reached an approved status.

    077
  78. Alteration now approved

    The latest status recorded for M08013693-P2 is “Approved.”

    078
  79. Alteration now approved

    The latest status recorded for M08013693-I1 is “Permit Entire.”

    079
  80. Alteration signed off

    DOB recorded a sign-off for M01437025-I1.

    080
  81. Alteration now completed

    The latest status recorded for M01437025-I1 is “LOC Issued.”

    081
  82. Alteration filed

    Installation of new sprinkler infrastructure and standpipe risers. Filing M00974604-P2.

    082
  83. Alteration now under review

    The latest status recorded for M00974604-P2 is “Plan Examiner Review.”

    083
  84. Alteration now approved

    The latest status recorded for M01034929-I1 is “Permit Entire.”

    084
  85. Alteration now approved

    The latest status recorded for M00597855-I1 is “Approved.”

    085
  86. Alteration filed

    Modifications for the removal and replacement existing chiller plant with associated work on the 23rd, Roof, Penthouse and Cooling Towers East & West. Filing M00597855-P1.

    086
  87. Alteration now closed

    The latest status recorded for M00597855-P1 is “Incomplete.”

    087
  88. Alteration now approved

    The latest status recorded for M08015085-I1 is “Permit Entire.”

    088
  89. Alteration filed

    Filing for interior alterations general construction work to modify an existing area on the 3rd floor level of Bellevue Hospital for New Philips Biplane Imaging suite. Filing M01468421-I1.

    089
  90. Alteration now closed

    The latest status recorded for M01468421-I1 is “QA Failed.”

    090
  91. Alteration now under review

    The latest status recorded for M01061556-P2 is “Objections.”

    091