NYC DOB record · M01339795-I1

462 First Avenue

462 First Avenue, Manhattan, NY 10016

Alteration filing in Murray Hill-Kips Bay, Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 9, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01339795-I1

462 First Avenue

Manhattan, NY 10016

Alteration filing · status dated Sep 3, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01339795-I1 as a alteration filing at 462 First Avenue, Manhattan, NY 10016. Its latest published status category is Approved, dated Sep 3, 2026. The published record does not state proposed stories or dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Sep 3, 2026
Proposed scale
Not stated in this filing
Complete building dossierView all 4 filings associated with BIN 1086515Applicant of recordSee the 3 filings that name Shane R. Hamilton
FiledAug 17, 2026
Current recordApproved
Proposed scaleNot specified
Recorded cost$50,000

What the filing says

A public-record reading of the proposed work.

Filing for the removal of existing wall mounted FCU, piping and associated controls. Relocate existing wall mounted Fan Coil unit and Install New Heat Pump on Roof.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 17-story health facility built in 1910, on a 753,175 sq ft lot.

Built
1910
Floors
17
Residential units
0
Building type
Health facility
Land use
Public facilities and institutions
Zoning district
R8
Lot area
753,175 sq ft
Building area
2,124,441 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 9, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 16 open notices on record for this building, out of 241 notices on file; the most recent was issued May 8, 2025.

  • Construction

    Issued May 8, 2025 — FAILURE TO MAINTAIN BUILDIING IN A CODE COMPLIANT MANNER. MULTIPLE CRACK BROKEN WINDOWS AT EXP#4 & EXP#1 DAMAGED PREFAB STONE IN MULTIPLE LOCATIONS @ EXP#4 & #1. REMEDY: REPAIR AND/OR REPLACE

  • Failure to correct swarmp conditions (facade)

    Issued May 7, 2025 — CYCLE 9 FAILURE TO CORRECT SWARMP CONDITIONS

  • Construction

    Issued Dec 28, 2024 — EWO DUE DETERIORATION HANGING/LOOSE/SPALLING CONCRETE, CRACKED/BROKEN WINDOW GLASS @ ALL EXP ALSO NOTED CRACKED/SPALLING CONCRETE @ CANOPY @ EXP1 (SOUTH) & EXP3 (NORTH). REMEDY: IMMEDLY TAKE/PROVIDE SAFETY MEASURE TO SECURE & PROTECT THE PUBLIC @ ALL EXP. MAKE IMMED REPAIR UNDER SUPERV OF LP. ALSO REMOVE/SECURE LOOSE AND HANGING MATERIAL

  • 13 further open notices are on file. Open the source dataset for the full list.

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 8, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01339795-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01339795-I1
BBL
1009620100
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
0
Proposed dwelling units
0