Building record · BIN 2004218

1175 Fulton Avenue

1175 Fulton Avenue, Bronx, NY 10456

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 2 independently sourced records, including 2 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 2004218

1175 Fulton Avenue

Claremont Village-Claremont (East), Bronx

A consolidated public-record view · updated Nov 9, 2026

DOB filings
2
Active-status
2
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings2
Open or active-status records2
First included filingJul 24, 2026
Latest recorded changeNov 9, 2026

The lot

What is already here?

The lot holds a 5-story walk-up apartment building built in 1925, with 43 homes, on a 9,261 sq ft lot.

  1. Floors 2–5Homes43 homes are recorded on this lot — about 11 homes to a floor. The city does not publish which floor any of them is on.
  2. Floor 1Street levelStreet level. The lot is recorded as walk-up apartments.
  • Street levelWalk-up apartments
  • Homes43 recorded on the lot
  • Above the southern skylineFrom about floor 11 — the tallest thing within 60 m to the south is 32.6 m
Drawn from the outline and roof height the Department of City Planning publishes for this building: 19.9 m over 5 floors, as the city counts them. 2 runs of floors have something on record. The city publishes a roof height and a storey count for the lot, and nothing at all about any individual floor. What stands to the south is measured from the city’s own footprints and roof heights; it is a statement about the skyline, not a calculation of sunlight.
Built
1925
Last altered
1967
Floors
5
Residential units
43
Building type
Walk-up apartment building
Land use
Walk-up apartments
Zoning district
R6
Lot area
9,261 sq ft
Building area
28,800 sq ft

What it sold for

1 apartment on this tax block changed hands in the year the city last published, at a median of $66,000.

Recorded sale prices from the Department of Finance’s rolling file, covering the year to Sep 30, 2026. Transfers under $10,000 are left out: New York records deed transfers between relatives at a dollar, and those are not sales. No apartment number and no name is carried from either side.

Owner of record

FULTON PLAZA HOUSINGDEVELOP FUND CORP.

As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 11, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

Violation record

Are there open violations here?

The Department of Buildings has 4 open notices on record for this building, out of 14 notices on file; the most recent was issued Jun 29, 2026.

  • Construction

    Issued Jun 29, 2026 — EMERGENCY WORK ORDER.A SECTION OF BRCK MASNRU@EXP1 WAS DISLODGED BETWEEN 5TH&6THFL LVLS OF C LINE APT,&THE FALLEN DEBRIS FROM THAT MASONRY SECTION DMGD THE SDWLK SHED.LINTEL OF APT4C WNDW ON 6THFL.OWNR TO RTAIN NYSPE&GC REG W/DOB TO IMMED 1.NYSPE TO SUBMIT MEANS&METHDS TO TEMP STBLZE THE DISLODGD FACADE&REMVE LOOSE

  • Construction

    Issued Jun 29, 2026 — FAILURE TO MAINTAIN BLDG IN A SAFE CONDITION.CRCKS WERE OBSVD ON PARAPET WALL@ALL EXPOSURES.AN ANNUAL PARAPET OBSERVATION IS REQUIRED TO BE COMPLETED ANNUALLY STARTING IN 2024.SUBMIT ANNUAL PARAPET OBSERVATION REPORT FOR 2025 TO BE RECEIVED BY DOB NO LATER THAN 07/13/26

  • Construction

    Issued Jun 29, 2026 — FAILURE TO MAINTAIN BLDG IN A SAFE CONDITION.AT EXP1 FACADE,SECTIONS OF BRCK MASONRY WERE LOOSE,DISLODGED,&CRCKD.PARAPET WALLS@ALL EXPS HAD CRCKS.CRCKS&SAGGNG CEILNGS WERE OBSVD IN APTS A,B,C,&D LINES.1.OWNR TO RTAIN NYSPE TO EVAL ENT STRCTRE&FILE RPAIR DWGS W/DOB,2.BLDG TO BE PERM RPAIRD UNDR PRMT STRTNG BY 8/10/26

  • 1 further open notice is on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 11, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 2004218. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 2 alteration filing. Its latest status categories are 1 under review, 1 approved. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Jul 24, 2026
Latest recorded change
Nov 9, 2026
Highest proposed story count
6 stories
Highest proposed unit count
43 dwelling units

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 1175 Fulton Avenue.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 2 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Facade repairs including brick masonry re-pointint/re-stitching, window lintel/sill replacement, parapet and roof membrane replacement, and resolve ecb violations 39194033h, 39194031y, 35728147y, etc. no change in occupancy, use or egress. Filing X01434499-I1.

    01
  2. Alteration approved

    Filing X01434499-I1 reached an approved status.

    02
  3. Permit recorded for alteration

    DOB lists a first permit date for X01434499-I1. That is not by itself confirmation of activity on site.

    03
  4. Alteration now approved

    The latest status recorded for X01434499-I1 is “Permit Entire.”

    04
  5. Alteration filed

    Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of the NYC building code. no change in use, occupancy, or egress under this application. Filing X01434441-P1.

    05
  6. Alteration now under review

    The latest status recorded for X01434441-P1 is “Prof Cert QA Review.”

    06