A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 5-story walk-up apartment building built in 1931, with 19 homes, on a 5,000 sq ft lot.
Housing violations
25 violations are open against this address under the Housing Maintenance Code. 3 of them are the class the city calls immediately hazardous.
Open means the Department of Housing Preservation and Development has not recorded it as corrected, which is not the same as nobody having fixed it. The city publishes the apartment each was written against; that is not carried here, because a count says a building has a problem and an apartment number says whose.
Owner of record
MRC-754 EAST 161ST STREET HOUSING & DEV FD CORP.
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 18, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
The Department of Buildings has 3 open notices on record for this building, out of 7 notices on file; the most recent was issued Dec 13, 2011.
Issued Dec 13, 2011 — VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
Issued Sep 16, 1997
Issued Aug 29, 1995
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 18, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 2010919. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 6 alteration filing. Its latest status categories are 4 under review, 2 approved. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 1500 Longfellow Avenue.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 6 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Moderate rehab of entire bldg to include direct replacement of finishes, kitchen cabinets & counter top, bathrooms (fixt. filed separately), interior and exterior doors & windows. remove & replace bldg entrance & vestibule, skylight. Filing X01363169-I1.
Removal and replacement of the existing steam supplied hot water generation to a direct natural gas fired water heating system. Filing X01363169-S5.
Replacement of existing kitchen and bathroom fixtures on existing rough in. replacement of existing cellar fixtures. Filing X01363169-S3.
Facade restoration, remove & replace roof assembly, parapet, new terra-cotta coping, exterior steel stair & handrail, sealant/caulk joints at stone & masonry and replace sill & cornice as per plans filed. Filing X01363169-S1.
Replacement of exhaust grilles and rooftop exhaust fans. installation of new smart insulated radiator covers. repair and replacement of heating piping and associated valves. installation of new vent piping for domestic water heaters. Filing X01363169-S4.
STRUCTURAL WORK IS TO PROBE AREAS WITHIN THE CELLAR CEILING FOR CRACKS AND VOIDS AND TO DETERMINE STRUCTURAL OR WATER DAMAGE TO CEILINGS WITHIN APTS. 1st THRU 5th FLOORS AS INDICATED ON PLANS. ALSO PARGE AND RE-POINTING OF STONE WALLS AT CELLAR. Filing X01363169-S2.
The latest status recorded for X01363169-S2 is “Plan Examiner Review.”
The latest status recorded for X01363169-I1 is “Objections.”
The latest status recorded for X01363169-S5 is “Objections.”
Filing X01363169-S3 reached an approved status.
The latest status recorded for X01363169-S3 is “Approved.”
The latest status recorded for X01363169-S1 is “Objections.”
Filing X01363169-S4 reached an approved status.
The latest status recorded for X01363169-S4 is “Approved.”