What the filing says
A public-record reading of the proposed work.
STRUCTURAL WORK IS TO PROBE AREAS WITHIN THE CELLAR CEILING FOR CRACKS AND VOIDS AND TO DETERMINE STRUCTURAL OR WATER DAMAGE TO CEILINGS WITHIN APTS. 1st THRU 5th FLOORS AS INDICATED ON PLANS. ALSO PARGE AND RE-POINTING OF STONE WALLS AT CELLAR.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 5-story walk-up apartment building built in 1931, with 19 homes, on a 5,000 sq ft lot.
- Built
- 1931
- Floors
- 5
- Residential units
- 19
- Building type
- Walk-up apartment building
- Land use
- Walk-up apartments
- Zoning district
- R7-1
- Lot area
- 5,000 sq ft
- Building area
- 22,000 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 18, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 3 open notices on record for this building, out of 7 notices on file; the most recent was issued Dec 13, 2011.
- Low pressure boiler
Issued Dec 13, 2011 — VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
- Local law 62/91 - boilers
Issued Sep 16, 1997
- Local law 62/91 - boilers
Issued Aug 29, 1995
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 18, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing X01363169-S2.
- Current status updated02
The latest recorded filing status is “Plan Examiner Review.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 83,050 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- X01363169-S2
- BBL
- 2030080017
- Postal code
- 10460 · 230 filings
- Review type
- Standard Plan Examination
- Existing stories
- 5
- Proposed stories
- 5
- Existing dwelling units
- 19
- Proposed dwelling units
- 19








