DOB filing X01287741-I1
Alteration filing at 788 Arnow Avenue
Building record · BIN 2053720
788 Arnow Avenue, Bronx, NY 10467
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 2 independently sourced records, including 1 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 2053720
788 Arnow Avenue
Allerton, Bronx
A consolidated public-record view · updated Sep 29, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 6-story elevator apartment building built in 1929, with 55 homes, on a 10,000 sq ft lot.
Housing violations
205 violations are open against this address under the Housing Maintenance Code. 95 of them are the class the city calls immediately hazardous.
Open means the Department of Housing Preservation and Development has not recorded it as corrected, which is not the same as nobody having fixed it. The city publishes the apartment each was written against; that is not carried here, because a count says a building has a problem and an apartment number says whose.
Owner of record
2768 SZ LLC
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 30, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
The Department of Buildings has 10 open notices on record for this building, out of 38 notices on file; the most recent was issued Jun 13, 2025.
Issued Jun 13, 2025 — CORRECTIVE ACTION PLAN REQ'D. OBSV SPALLING BRICKS ALONG THE PARAPET WALLS OF THE BLDG.CMU WALL W/CRAKS,.THREE DAMAGED COPPINGON ROOF,TWO FIRE ESCAPE LINES W/MINOR DAMAGES.OWNER TO IMMED RETAIN REG DESIGN PROF TO EVAL ENTIRE BLDG & SUBMIT CORRECTIVE ACTION PLAN WITHIN 30 DAYS
Issued Apr 25, 2025 — CORRECTIVE ACTION PLAN REQ'D. OBSV SPALLING BRICKS ALONG THE PARAPET WALLS OF THE BLDG. CMU WALL WITH CRACKS,3 DAMAGED COPPING ON ROOF, 2 FIRE ESCAPE LINES W/MINOR DAMAGES,DAMAGE GLASS WINDOW&CELING ON 6FL MISSING MORTAR AROUND BRICKS ABD COLUMNS. OWNER TO IMMED RETAIN REG DESIGN PROF TO EVAL ENTIRE BLDG SUBMIT CORRECTIVE ACTION PLAN
Issued Nov 26, 2024 — EMERGENCY WORK ORDER DUE TO EXP#1N CRACKED/SPALLING BELT COURSE/WINDOW SILLS/DECORATIVE STONE.CRACKED CMU PARAPET,CRACKED SPALLING EXP#2E BUL BRICK NE END SPANDREL BTW 6/5FL. REMEDY: TAKE & PROVIDE ADEQUATE SAFET MEASURES TO SECURE/PROTECT PUBLIC & INSTALL PUB PROTEC @ EXP#1. ALSO IMMEDIATE REPAIRS U/SUPERVISION OF NYS LICENSED PROFESSIONAL
7 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 30, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 2053720. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 2 alteration filing. Its latest status categories are 1 approved, 1 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 788 Arnow Avenue.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 2 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Application file for facade repair work as per plans and lifting of NYC DOB-issued ecb violation # 35716897p & 35689225l. there will be no change in the use, egress, or occupancy under this application. Filing X01287741-I1.
Filing X01287741-I1 reached an approved status.
DOB lists a first permit date for X01287741-I1. That is not by itself confirmation of activity on site.
Suspended scaffold outrigger system at 788 arnow avenue, bronx, for facade restoration work. there will be no change in the use, egress, or occupancy under this application. Filing X01419773-I1.
Filing X01419773-I1 reached an approved status.
DOB lists a first permit date for X01419773-I1. That is not by itself confirmation of activity on site.
DOB recorded a sign-off for X01419773-I1.
The latest status recorded for X01419773-I1 is “LOC Issued.”
The latest status recorded for X01287741-I1 is “Permit Entire.”