What the filing says
A public-record reading of the proposed work.
Application file for facade repair work as per plans and lifting of NYC DOB-issued ecb violation # 35716897p & 35689225l. there will be no change in the use, egress, or occupancy under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 6-story elevator apartment building built in 1929, with 55 homes, on a 10,000 sq ft lot.
- Built
- 1929
- Floors
- 6
- Residential units
- 55
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R6
- Lot area
- 10,000 sq ft
- Building area
- 46,008 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 30, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 10 open notices on record for this building, out of 38 notices on file; the most recent was issued Jun 13, 2025.
- Construction
Issued Jun 13, 2025 — CORRECTIVE ACTION PLAN REQ'D. OBSV SPALLING BRICKS ALONG THE PARAPET WALLS OF THE BLDG.CMU WALL W/CRAKS,.THREE DAMAGED COPPINGON ROOF,TWO FIRE ESCAPE LINES W/MINOR DAMAGES.OWNER TO IMMED RETAIN REG DESIGN PROF TO EVAL ENTIRE BLDG & SUBMIT CORRECTIVE ACTION PLAN WITHIN 30 DAYS
- Construction
Issued Apr 25, 2025 — CORRECTIVE ACTION PLAN REQ'D. OBSV SPALLING BRICKS ALONG THE PARAPET WALLS OF THE BLDG. CMU WALL WITH CRACKS,3 DAMAGED COPPING ON ROOF, 2 FIRE ESCAPE LINES W/MINOR DAMAGES,DAMAGE GLASS WINDOW&CELING ON 6FL MISSING MORTAR AROUND BRICKS ABD COLUMNS. OWNER TO IMMED RETAIN REG DESIGN PROF TO EVAL ENTIRE BLDG SUBMIT CORRECTIVE ACTION PLAN
- Construction
Issued Nov 26, 2024 — EMERGENCY WORK ORDER DUE TO EXP#1N CRACKED/SPALLING BELT COURSE/WINDOW SILLS/DECORATIVE STONE.CRACKED CMU PARAPET,CRACKED SPALLING EXP#2E BUL BRICK NE END SPANDREL BTW 6/5FL. REMEDY: TAKE & PROVIDE ADEQUATE SAFET MEASURES TO SECURE/PROTECT PUBLIC & INSTALL PUB PROTEC @ EXP#1. ALSO IMMEDIATE REPAIRS U/SUPERVISION OF NYS LICENSED PROFESSIONAL
7 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 30, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing X01287741-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 72,082 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- X01287741-I1
- BBL
- 2045120031
- Postal code
- 10467 · 195 filings
- Review type
- Standard Plan Examination
- Existing stories
- 6
- Proposed stories
- 6
- Existing dwelling units
- 55
- Proposed dwelling units
- 55