Building record · BIN 3001894

119 Henry Street

119 Henry Street, Brooklyn, NY 11201

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 4 independently sourced records, including 2 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 3001894

119 Henry Street

Brooklyn Heights, Brooklyn

A consolidated public-record view · updated Oct 15, 2025

DOB filings
4
Active-status
2
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings4
Open or active-status records2
First included filingMay 28, 2021
Latest recorded changeOct 15, 2025

The lot

What is already here?

The lot holds a 3.5-story walk-up apartment building built in 1849, with 5 homes, on a 2,312 sq ft lot.

Built
1849
Last altered
1989
Floors
3.5
Residential units
5
Building type
Walk-up apartment building
Land use
Walk-up apartments
Zoning district
R7-1
Lot area
2,312 sq ft
Building area
5,000 sq ft
Historic district
Brooklyn Heights Historic District

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

Violation record

Are there open violations here?

The Department of Buildings has 2 open notices on record for this building, out of 7 notices on file; the most recent was issued Jun 14, 2001.

  • Construction

    Issued Jun 14, 2001 — WORK WITHOUT A PERMIT. WORK NOTED: GUT RENOVATION OF APARTMENT AT BASE MENT LEVEL, FIRST , SECOND FLOORS. PARTITIONS REMOVED. WALLS OPEN THRO UGHOUT. PLUMBING AND ELECTRICAL FIXTURES INSTALLED REMEDY: OBTAIN ALL NECESARY PERMITS AND APPROVALS

  • Construction

    Issued Mar 15, 1999 — WORK WITHOUT A PERMIT. WORK NOTED: GUT RENOVATION OF APTS AT BASEMENT LEVEL, 1ST & 2ND FLOORS. PARTITIONS REMOVED, WALLS OPEN, BRICKS REMOVE THRU FIRE PLACE AREA; PLUMBING AND ELECTRICAL FIXTURES REMOVED. NEW PARTITIONS ERECTED, NEW PLUMBING & ELECTRICAL FIXTURES INSTALLED. STOP ALL WORK. REMEDY: OBTAIN PERMITS AND APPROVALS FROM DOB. 718-802-3685

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3001894. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 4 alteration filing. Its latest status categories are 2 closed or withdrawn, 2 approved. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
May 28, 2021
Latest recorded change
Oct 15, 2025
Highest proposed story count
5 stories
Highest proposed unit count
4 dwelling units

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 119 Henry Street.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 4 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Interior renovation to unit 3 on the 2nd floor as per plans filed herewith. no change to use, egress, or occupancy. Filing B00513826-I1.

    01
  2. Alteration filed

    Plumbing work in unit 3 on the 2nd floor as per plans filed herewith. no change to use, egress, or occupancy. Filing B00513845-I1.

    02
  3. Alteration approved

    Filing B00513845-I1 reached an approved status.

    03
  4. Alteration approved

    Filing B00513826-I1 reached an approved status.

    04
  5. Alteration filed

    The purpose of this project is to replace existing roof deck in compliance with buildings bulletin 2018-002.1 and increase size of existing bulk head. no with no change to egress, occupancy, or use. Filing B00500385-I1.

    05
  6. Alteration filed

    Plumbing work in unit 3 on the 2nd floor as per plans filed herewith. no change to use, egress, or occupancy. Filing B00513845-P1.

    06
  7. Alteration approved

    Filing B00513845-P1 reached an approved status.

    07
  8. Permit recorded for alteration

    DOB lists a first permit date for B00513845-I1. That is not by itself confirmation of activity on site.

    08
  9. Alteration now approved

    The latest status recorded for B00513845-P1 is “Approved.”

    09
  10. Permit recorded for alteration

    DOB lists a first permit date for B00513826-I1. That is not by itself confirmation of activity on site.

    010
  11. Alteration approved

    Filing B00500385-I1 reached an approved status.

    011
  12. Permit recorded for alteration

    DOB lists a first permit date for B00500385-I1. That is not by itself confirmation of activity on site.

    012
  13. Alteration now approved

    The latest status recorded for B00500385-I1 is “Permit Entire.”

    013
  14. Alteration now closed

    The latest status recorded for B00513845-I1 is “Filing Withdrawn.”

    014
  15. Alteration now closed

    The latest status recorded for B00513826-I1 is “Filing Withdrawn.”

    015