NYC DOB record · B00513845-I1

119 Henry Street

119 Henry Street, Brooklyn, NY 11201

Alteration filing in Brooklyn Heights, Brooklyn. The latest DOB status is filing withdrawn.

The applicant withdrew this filing, so it is not going forward. What every status means

Closed or withdrawnAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 14, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00513845-I1

119 Henry Street

Brooklyn, NY 11201

Alteration filing · status dated Sep 26, 2025

Current record
Closed or withdrawn
Proposed scale
Not stated
Dwelling units
4
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00513845-I1 as a alteration filing at 119 Henry Street, Brooklyn, NY 11201. Its latest published status category is Closed or withdrawn, dated Sep 26, 2025. The filing records 4 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Closed or withdrawn
Latest status date
Sep 26, 2025
Proposed scale
4 proposed dwelling units
Complete building dossierView all 4 filings associated with BIN 3001894Applicant of recordSee the 7 filings that name Matthew Cordone Architect PLLC
FiledMay 28, 2021
Current recordClosed or withdrawn
Proposed scale4 units
Recorded cost$20,000

What the filing says

A public-record reading of the proposed work.

Plumbing work in unit 3 on the 2nd floor as per plans filed herewith. no change to use, egress, or occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 3.5-story walk-up apartment building built in 1849, with 5 homes, on a 2,312 sq ft lot.

Built
1849
Last altered
1989
Floors
3.5
Residential units
5
Building type
Walk-up apartment building
Land use
Walk-up apartments
Zoning district
R7-1
Lot area
2,312 sq ft
Building area
5,000 sq ft
Historic district
Brooklyn Heights Historic District

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 2 open notices on record for this building, out of 7 notices on file; the most recent was issued Jun 14, 2001.

  • Construction

    Issued Jun 14, 2001 — WORK WITHOUT A PERMIT. WORK NOTED: GUT RENOVATION OF APARTMENT AT BASE MENT LEVEL, FIRST , SECOND FLOORS. PARTITIONS REMOVED. WALLS OPEN THRO UGHOUT. PLUMBING AND ELECTRICAL FIXTURES INSTALLED REMEDY: OBTAIN ALL NECESARY PERMITS AND APPROVALS

  • Construction

    Issued Mar 15, 1999 — WORK WITHOUT A PERMIT. WORK NOTED: GUT RENOVATION OF APTS AT BASEMENT LEVEL, 1ST & 2ND FLOORS. PARTITIONS REMOVED, WALLS OPEN, BRICKS REMOVE THRU FIRE PLACE AREA; PLUMBING AND ELECTRICAL FIXTURES REMOVED. NEW PARTITIONS ERECTED, NEW PLUMBING & ELECTRICAL FIXTURES INSTALLED. STOP ALL WORK. REMEDY: OBTAIN PERMITS AND APPROVALS FROM DOB. 718-802-3685

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00513845-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Filing Withdrawn.”

    04

For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00513845-I1
BBL
3002370035
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
4
Proposed dwelling units
4